OSHA
VOLTAGE
WIRE ROPE
OUTTRIGGER
OSHA2
100

According to OSHA 1926.1400, when working near power lines when do you need a dedicated spotter?

Within booms length of a power line
100

When working near power lines, what type of tag line should you use?

polypropylene

100

Joining lengths of wire rope by splicing is what?

Prohibited

100

When setting up the crane, the operator can see 3 of the 4 outriggers. What is needed?

Dedicated Spotter
100

A basket Hitch is what of a Vertical hitch

200%

200

According to OSHA 1926.1400, what is the difference between Load moment indicator and a Load moment limiter.

Load moment indicator indicates with lights, bells, buzzers and a Load moment limiter shuts off power to those functions which can increase the severity of loading on the equipment

200

When working near a 90,00 volt power line, how far away do you stay?

15 feet

200

Using the preferred method of installing wire rope from a reel onto a hoist drum, the rope runs from the:

Top of the reel to the top of the drum

200

How thick do the Outrigger pads need to be?

4 inches thick

200

Who is responsible for knowing the weight of components?

Site Supervisor

300

According to ASME B30.5 and OSHA, which cranes need a LMI? 

3 tons and above

300

According to Option 2 in OSHA 1926.1407, when working near  50kv power line. How far do you stay away?

20 feet

300

When the number of layers of rope on a drum increases the line pull capacity does what?

Decreases 

300

According to ASME B30.5, what material do the outrigger pads need to be made out of?

Hard wood

300

When a crane arrives at a jobsite, how does the operator know that Operator manual belongs to that crane?

Serial Number

400

When working near powerlines, What has to be on the crane?

Special hazard warnings. One inside the cab and Two on the outside of the equipment.

400

When traveling with a crane, how far do you stay away from a 750 volt powerline?

4 feet

400

What is the most common type of Hook used?

Self Closing swivel hook

400

The Float pad of the Outrigger needs to be _______ to the Outrigger Rod

positively attached

400

When is it allowed to sideload a crane?

With freely suspended loads only
500

In a Two blocking situation, what three functions are limited?

Hoist up, Boom down and Extend out

500
When operating a crane near 350 kv power lines and the lines have insulated boots, Can you get closer to the line because of the boots?
No
500

What is a common sign of core failure according to ASME B30.5 in rotation resistance rope?

Reduction of wire rope

500

You are setting your crane up in a confined area and you cannot fully extend your fourth outrigger. Your crane does not have a load chart for intermediate extension working. In such a situation you should use the capacities in the?

On rubber Chart

500

According to OSHA 1926.1400, what is one thing that can be removed from the cab of a  derricked crane on a barge?

Level