Random PMK
Gas Cylinders
Supply Codes
Supply Financials
R-Supply
100
An E-6 has this High Year Tenure (HYT)
What is 20 years?
100
This color of cylinder contains refrigerants.
What is an orange cylinder?
100
This status code indicates a backorder.
What is BB status?
100
A GCPC holder must notify the APC of transfer within this time frame.
What is 60 days?
100
Before a user can use R-Supply, the must have access to this system.
What is Naval Tactical Command Support System II (NTCSS II)?
200
This EVAL block identifies qualifications or achievements.
What is block 44?
200
This color of cylinder contains toxic material.
What is a brown cylinder?
200
This project code is for an aircraft that is Non Mission Capable Supply (NMCS).
What is AK0?
200
These are the first two numbers in a Navy appropriation symbol.
What are 1 and 7?
200
R-Supply has this number of subsystems.
What is 5?
300
This ship was the first nuclear powered aircraft carrier?
What is USS Enterprise (CVN-65)?
300
This color of cylinder is used with firefighting.
What is a red cylinder?
300
This advice code is for initial outfitting.
What is advice code 5D?
300
This publication is titled: Financial Managment of Resources.
What is the NAVSO P-3013-2?
300
This publication is known as the R-Supply user manual.
What is the NAVSUP P-732?
400
This NAVREGS article covers Equal Opportunity (EO).
What is article 1164?
400
This color of cylinder contains oxidizing material.
What is a green cylinder?
400
This status code indicates a delay?
What is BD status?
400
This is the instruction of the Navy-Wide Government Commercial Purchase Card Program policy.
What is NAVSUPINST 4200.99B?
400
This individual will assign R-Supply users with a logon ID.
Who is the Functional Area Supervisor?
500
A nautical mile is this long if measured in feet.
What is 6,080 feet?
500
This color of cylinder contains industrial gases.
What is a Buff (Tan) Cylinder?
500
This Material Control Code (MCC) is for a depot level repairable.
What is MCC - H?
500
This type of funding would be used to procure items costing $250,000 or more.
What is Other Procurement Navy (OPN) funding?
500
This R-Supply subsystem allows users to review specific transactions related to stock, requisition and transaction ledgers.
What is Query subsystem?