Programming
FF&E
Code
Construction Drawings
Miscellaneous
100
Conducting a site analysis is?


Not necessary for smaller projects, Due diligence, The architect's responsibility, Done during the design development phase

Due diligence

100

A product that is reusable after it has served its purpose in the original building is what in the life cycle of another building?

Salvaged materials

100

What is the size of grab bars at the side of an accessible (barrier free) toilet?

42" long

100

What is the correct order for construction drawings?

Civil, Architectural, Structural, Plumbing, Mechanical, Electrical

100

Which of the following is not a color scheme?

Tetrad, Analogous, Tertiary, Triad

Tertiary

200

Analyzing transportation available to your client's proposed new urban business location would be part of which part of the design process?


Site Context Analysis

200

Which is the strongest natural fiber?

Jute, Linen, Wool, Silk

Jute

200

What is the minimum clear floor space required for side transfer for an accessible (barrier free) shower?

30" x 48"

200

Which drawing sheets will contain specific information about the door and window construction and location?

Elevations and sections

200

What is the term used for the aspect of reviewing best practices within an industry by comparing a firm's activities or functions with others in the field?

Benchmarking

300

At what point in the design process would you create a parti diagram?

Before the design concept statement is created, After the bubble diagrams and design concept are completed, Schematic design phase, During the programming design phase

After the bubble diagrams and design concept are completed

300

A Class A fabric will not?

Ignite, Smolder, Char, Produce Smoke

Ignite

300

Upper shelves located above an accessible (barrier free) work surface must not exceed?

44" H

300

What are the three systems used for standard size drafting sheets?

ISO, ANSI, Architectural

300

What can be best describes as the correctness of fit between objects and spaces and the needs of the people using those objects and spaces?

Human factors

400

All of the following are components of the programming report EXCEPT?

Budget requirements, Summary of space needs, Design Concept, Goals & objectives

Design Concept

400

When installing a counter top on base cabinets what would the installer use to precisely fit the counter top to the wall?

Scribe piece

400

What standard is used to evaluate the requirements of emergency voice/alarm communication systems?

NFPA 13, NFPA 70, NFPA 72, NFPA 723


NFPA 72

400

What kind of scale is best used to measure the size of a drawn feature in feet and decimal fractions of a foot?

An engineer's scale
400

Which of the following scheduling methods allow for interaction and discussion among the team as it relates to project scheduling?

CPM chart, PERT chart, Full wall schedule, Gantt chart

full wall schedule

500

In addition to function, the book Problem Seeking names three other considerations for design problems, which are?

Form, economy, & time

500

Which form of stainless steel should be specified for ornamental interior applications?

ornamental tubing

500

Which test determines the colorfastness under light exposure of textile materials?

AATCC 16

500

Where on the construction drawings is it MOST appropriate to indicate that corridors conform to surface requirements for accessible routes?

On the detail sections, On the elevations, On the floor plans, In the schedules

On the detail sections

500

What is the most obviously controllable aspect of a lighting design to address the sensory needs of the largest group of individuals?

Brightness