Not necessary for smaller projects, Due diligence, The architect's responsibility, Done during the design development phase
Due diligence
A product that is reusable after it has served its purpose in the original building is what in the life cycle of another building?
Salvaged materials
What is the size of grab bars at the side of an accessible (barrier free) toilet?
42" long
What is the correct order for construction drawings?
Civil, Architectural, Structural, Plumbing, Mechanical, Electrical
Which of the following is not a color scheme?
Tetrad, Analogous, Tertiary, Triad
Tertiary
Analyzing transportation available to your client's proposed new urban business location would be part of which part of the design process?
Site Context Analysis
Which is the strongest natural fiber?
Jute, Linen, Wool, Silk
Jute
What is the minimum clear floor space required for side transfer for an accessible (barrier free) shower?
30" x 48"
Which drawing sheets will contain specific information about the door and window construction and location?
Elevations and sections
What is the term used for the aspect of reviewing best practices within an industry by comparing a firm's activities or functions with others in the field?
Benchmarking
At what point in the design process would you create a parti diagram?
Before the design concept statement is created, After the bubble diagrams and design concept are completed, Schematic design phase, During the programming design phase
After the bubble diagrams and design concept are completed
A Class A fabric will not?
Ignite, Smolder, Char, Produce Smoke
Ignite
Upper shelves located above an accessible (barrier free) work surface must not exceed?
44" H
What are the three systems used for standard size drafting sheets?
ISO, ANSI, Architectural
What can be best describes as the correctness of fit between objects and spaces and the needs of the people using those objects and spaces?
Human factors
All of the following are components of the programming report EXCEPT?
Budget requirements, Summary of space needs, Design Concept, Goals & objectives
Design Concept
When installing a counter top on base cabinets what would the installer use to precisely fit the counter top to the wall?
Scribe piece
What standard is used to evaluate the requirements of emergency voice/alarm communication systems?
NFPA 13, NFPA 70, NFPA 72, NFPA 723
NFPA 72
What kind of scale is best used to measure the size of a drawn feature in feet and decimal fractions of a foot?
Which of the following scheduling methods allow for interaction and discussion among the team as it relates to project scheduling?
CPM chart, PERT chart, Full wall schedule, Gantt chart
full wall schedule
In addition to function, the book Problem Seeking names three other considerations for design problems, which are?
Form, economy, & time
Which form of stainless steel should be specified for ornamental interior applications?
ornamental tubing
Which test determines the colorfastness under light exposure of textile materials?
AATCC 16
Where on the construction drawings is it MOST appropriate to indicate that corridors conform to surface requirements for accessible routes?
On the detail sections, On the elevations, On the floor plans, In the schedules
On the detail sections
What is the most obviously controllable aspect of a lighting design to address the sensory needs of the largest group of individuals?
Brightness