SAFETY
ACCOUNTING
PRODUCTION
ADMINISTRATIVE
QUALITY CONTROL
100
Only Fiberglass are to be used on NEI jobsites.
What is a ladder?
100
This form, __________, material and intermediate subcontractors payment affidavit is to be included with the subcontractor's application for payment.
What is Exhibit G?
100
_________ are developed and maintained by the Contractor and depict actual conditions, including deviations(contract mod's, RFI's, etc.) from the contract documents.
What are as-built drawings?
100
On government projects, these are completed to assure compliance with Davis Bacon Wage Scales.
What are certified payrolls?
100
A preparatory meeting is required for each _____________.
What is Definable Feature of Work (DFOW)?
200
Must be performed on any energy equipment prior to work commencing.
What is lockout/tagout?
200
Final checklist for payment forms must be signed by the Project Manager and __________.
Who is Jeff Joyce?
200
Typically on commercial projects, this card must be promptly displayed on the premises, visible from the street and must remain until construction is completed.
What is a building permit?
200
This log is used to track monthly billings and contract modifications.
What is an invoice status log?
200
These 3 documents must be reviewed prior to the start of any activity.
What are Preparatory, Activity Hazard Analysis and submittal?
300
Must be maintained for each hazardous substance, with the site map attached.
What is a safety data sheet?
300
The form was revised in April 2017 to more accurately reflect the information the subcontractor is to insert.
What is Exhibit D, subcontractor application for payment?
300
The OSHA form _______, summary of work-related injuries and illnesses must be posted or in the jobsite binder at each project site.
What is form 300A?
300
Attachment #_______, defines the insurance requirements and is included in all subcontracts.
What is attachment #2?
300
When a concrete truck arrives, the testing technician should be on site to check _______, _____ and _______.
What is slump, air and temperature?
400
A VOSH/OSHA citation must remain posted until the violations(s) have been abated, or for _______ working days.
What is three (3)?
400
A project has 5% retainage. The value of completed work to date is $10,000. How much retainage (4) should be withheld for this pay application.
What is $500.00?
400
Section_______, statement of safety and health policy is included in the project specific APP.
What is Section 3?
400
Exhibit _____, Affidavit, waiver and release for final payment must be signed and notarized prior to releasing final payment.
What is Exhibit J?
400
Prior to any compaction test a ___________ is required minimum 3 days in advance to determine percentage of compaction from the nuclear density test.
What is a soil analysis (proctor)?