A transformer is an example of this type of work
What is capital
CFCI Installations is an example of this
What is a project
Type of redesign when the CWO has not been QUAC'd when a redesign is required
What is a pre-quotation accept
Business Manager for Central Region FBCs
Who is Jennifer Bambridge
The Director of Work Line Management(AKA FBCs)
Who is Gianni Difilippo
A non-emergent trouble call
What is an Assigned Trouble
A municipality will request a road authority for this reason
What is road work
A redesign is required when a change is needed after the design is in this status
What is DAPV
Planning CSS for Central Region FBC
Who is Breanne Hillier
The name of the device used to give a customer power when they have a bad underground
What is a service save/cab tire
This is what JUMP stands for
What is Joint Use Management Portal
Customer requested changes after they paid means this type of redesign
What is a pre-construct redesign
Customer Group CSS in Barrie
Who is Lori Moore
Refusing a switch is an example of this type of work
What is maintenance
End of Life pole replacement is an example of this
This is the PMACType for a customer driven redesign
What is RDC
Customer Group CSS in Peterborough
Who is Tracy Tate
Approval is required from the project manager for a post trouble in this case
What is when a design is required to make changes.
Transformers after this year require testing for PCBs
What is 1981
This is the where the WBS for a redesign can be located
What is the reporting register
Manager of all FBCs
Who is Anthony Pellecchia