HR Policies
Safety
Environmental
Production
Production
100

What is the correct process to call in?

Text/Call your supervisor first

100

What do you do when your machine jams? 

STOP, CALL, WAIT

100

What does S.D.S stand for?

Safety Data Sheet

100
What document is used to train team members by?

Standard Work

100

What does SC mean on a checksheet?

Special Characteristic

200

How do you request PTO?

Hint: APP 

Using the Nova Mobile App

200

What PPE items must you have on before entering in the building?

Safety Glasses, Earplugs*, Steel Toe Shoes, Vest*.

*Earplugs are not required in Motor clean rooms. Vests are required for all areas suspension or while walking between buildings. 

200

What does a code Red & Green mean?

Red-Fire

Green-Weather

200

What does a "V" and "A" mean on a check sheet?

V = variable (Reading)

A = attribute (Visual OK Check)

200

What does E.C.R stand for?

Engineering Change Request

300

You must call/text in how long before your start of shift?

30 minutes
300

Who do you report a accident to & how quickly? 

Supervisor & immediately. 

300

What kind of label should be on a bottle to clean with?

HMIS

300

What are the 5S's?

Sort, Straighten, Shine, Standardize, Sustain 

300

How many hours into the shift should your check sheets be signed off on?

What do you do if there not?

2 Hours & STOP, CALL, WAIT

400

How many occurrences result in disciplinary action?

MHT-2

Suspension-3

400

What is the max lift for 1 person?

35lbs

400

What does a code Blue & code Yellow mean?

Yellow-Spill

Blue-Medical

400

What steps to take when you have Non-Conforming Material?

Contain in a red reject bin, mark with red marker or red tag.

400

What is the purpose of standard work? 

To perform a task one way. 

500

What is the difference between EPTO & Unscheduled PTO? 

EPTO must be requested, limited to two per year, deducted from annual PTO balance and is an excused absence.  Unscheduled PTO is an occurrence and deducted from your PTO balance.

500

What is the max height for lifting something off of a rack?

60 inches or 5ft

500

What does H.U.R.T stand for?

Hitachi Urgent Response Team

500

When do you run a Pokayoke?

Start of Shift & Changeover

500

What is a Team Members Responsibility? 

Name 5

Work safe, Build Quality Parts, Refer to Standard Work, Identify Abnormal Conditions, Good Attendance, Follow Company Rules, Perform Quality Checks, Meet Cycle Time, Be on Time at Start of Shift & Breaks.