Cells
Safety
Parts
Misc
Tier Board
100

How many cells are in quad 4?

0

100

How many classes of hazardous materials are there?

9

100

The amount of parts used in Cell 30

What is 4?

100

List the leak tester stations in Magneto

C16 (buffer packs and FW), C55 (12-up and 2-up)

100

The amount of stretch breaks per shift

What is 2?

200

What happens at C32?

Lubricant added, filter basket is heat staked and added to fluidic housing

200

The amount of spilled lysis to be considered a "small" spill

What is <500mL

200

The 3 parts added to the fluidic housing at C35

What is the Spring, Trigger lever with BB, and plunger?

200

Another name for the lubricant at C32

What is dyed silicone?

200

The amount of sections on the tier board

What is 5?

300

The only cell with an offload conveyor

C45

300

What class of DG is lysis?

Class 8: Corrosive

300

These are added to the fluidic housing at C45

PMP Bead and bottom seal

300

DAILY DOUBLE

Name the 8 wastes in manufacturing

Defects Overproduction Waiting Non-utilized Talent Transportation Inventory Motion Extra-processing


300

The shift goal for Magneto

What is 4320?

400

DAILY DOUBLE

These cells/machines use heat

What is C15, C32, C50, and the FW

400

PPE required to handle lysis

Lab coat, chemical-resistant gloves, safety glasses, chemical-resistant sleeves (when pouring), safety goggles (when pouring), face shield (when pouring)

400

The size of the BB added to the trigger

5MM

400

What does the blue light mean on each cell alarm?

Quality Stop

400

The 5 sections on the tier board

What is Safety, Quality, People, Customer, Cost.

500

C50 S40. What temperature is the welding station set to?

421°F

500

What is the technical name for lysis buffer?

Guanidinium Thiocyanate solution

500

The parts added to the fluidic housing at C50

PCR retainer, PCR tubes with reactions and BBs.

500

The current PPM for C32 filter basket heat stake

What is 5.4 PPM?

500

The output by hour that meets the customer goal

What is 540?