DEFINITIONS
MED AIR
ALARMS
PRESSURES
INSPECTIONS
100

A document that is advisory or informative.

what is a GUIDE

100

MEDICAL AIR SHALL NOT POWER THIS.

What is a VENTURI.

100

AREA ALARMS SHALL BE LOCATED HERE.

What is a NURSES STATION OR OTHER SIMILAR LOCATIONS THAT PROVIDE SURVEILLANCE.

100

HOSE AND FLEXIBLE CONNECTORS SHALL BE SUITABLE FOR THIS PSIG.

What is 300 PSIG.

100

THIS WILL BE THE FIRST THING YOU DO WHEN YOUR INSTALLATION OF DISTRIBUTION PIPING IS DONE.

what the INITIAL BLOW DOWN.

200

AN EXTENSIVE COMPILATION OF PROVISIONS THAT IS SUITABLE FOR ADOPTION INTO LAW.

What is a CODE

200

PERMANENT PARTICULATES CAN BE SIZED TO THIS.

What is 1 MICRON.

200

AREA ALARM PANELS MONITOR PRESSURE INCREASE OR DECREASE BY THIS PERCENTAGE.

What is 20%

200

A PRESSURE OF 160 psi - 185 psi IS COMMON FOR THIS GAS.

What is NITROGEN, INSTRUMENT AIR or SUPPORT GAS.

200

THIS WILL BE DONE BEFORE INSTALLATION OF STATION OUTLETS/INLETS ROUGH IN ASSEMBLIES AND OTHER SYSTEM COMPONENTS (PRESSURE/VACUUM ALARM DEVISES , INDICATORS, PRESSURE RELIEF VALVES, MANIFOLDS, AND SOURCE EQUIPMENT.

What is the INITIAL BLOW DOWN.

300

INDICATES A MANDATORY REQUIREMENT.

What is SHALL

300

MEDICAL AIR SHALL MEET THE REQUIREMENTS OF THESE THREE LETTERS.

What is  USP.

300

AN INCREASE OR DECREASE IN PRESSURE WILL BE SENT TO THESE TWO ALARM PANELS.

What is AREA and MASTER.

300

INSTRUMENT AIR SOURCES SHALL BE CAPABLE OF PRODUCING NO LESS THAN THIS PSI.

What is 200 PSI

300

AFTER THE INITIAL BLOW DOWN AND PRIOR TO INSTALLATION OF OF COMPONENTS OF THE DISTRIBUTION THAT WOULD BE DAMAGED BY A TEST PRESSURE OF 150 PSI.

What is the INITIAL PRESSURE TEST.

400

A DOCUMENT,  THE MAIN TEXT OF WHICH CONTAINS ONLY MANDATORY PROVISIONS USING THE WORD "SHALL" TO INDICATE REQUIREMENTS.

What is a STANDARD.

400

MEDICAL AIR COULD ALSO BE MADE FROM THESE TWO GASSES.

What is OXYGEN USP AND OIL FREE DRY NITROGEN USP.

400

ALARM INDICATION WHEN OR JUST BEFORE CHANGE OVER OCCURS IN A MEDICAL GAS SYSTEM WILL BE SENT TO THIS ALARM PANEL.

What is MASTER.

400

MEMORY METAL FITTINGS SHALL BE RATED FOR THIS PSI.

What is 300 PSI.

400

DURING THE THE INITIAL PIPING PURGE TEST YOU SHALL USE THESE.

What is the APPROPRIATE ADAPTERS.

500

NON-MANDATORY PROVISIONS WOULD BE FOUND HERE.

What is the APPENDIX, ANNEX, FOOTNOTE OR INFORMATIONAL NOTE.

500

MEDICAL AIR SHALL BE ALLOWED HOW MANY DETECTABLE LIQUID HYDROCARBONS.

What is ZERO or NO.

500

THIS VARIANCE OF A PERCENTAGE OF OXYGEN CONCENTRATION, IN A PROPORTIONING SYSTEM, WILL TRIGGER A LOW/HIGH AT THE LOCAL ALARM.

what 19.5 % to 23.5%

500

WAGD SYSTEMS OPERATE AT THIS LEVEL OF VACUUM.

What is 5 in. HgV.

500

THE INITIAL PIPING PURGE TEST SHALL START HERE AND END HERE.

What is the CLOSEST OUTLET/INLET TO THE ZONE VALVE AND CONTINUE TO THE FURTHEST OUTLET/INLET WITHIN THE ZONE.