The time at which the AHA should be complete by
What is Preparatory Meeting?
When can you start requesting submittals and pre-requisites from Trade Partners?
What is an executed LOI?
The acronym for this is a PCCO
What is Prime Contract Change Order?
The title for Part 3 of Specifications
What is Execution?
The fourth step of the 6-step process
What is Initial Inspection?
The minimum height above floor at which a fall arrest system can be used
What is 18 1/2 Feet?
The type of contract for a material supplier (over $2,000)
What is a Purchase Agreement?
The two types of PCOs
What is Internal and Owner (Prime/External)?
Division 01 of CSI Specifications
What is General Requirements?
The step that is not called out in the 6-step process, but is a necessary procedure (between step 3 and step 4)
What is Material Inspection?
As of the start of the year 2023, there are this many designated safety personnel are in the Rocky Mountain Region.
What is 14?
The percentages of contract increase at which a Consent of Surety is required for the Bond per FOG731
What is 10% single and 35% aggregate?
What section of the subcontract lists inclusions and exclusions?
What is Section B?
The number of divisions in the standard CSI MasterFormat
What is 50?
The name of the first step per the 6-Step QC Flow Chart
What is Purchasing Meeting?