Safety
Contracting
Financials
Submittal/Specifications
6-Step
100

The time at which the AHA should be complete by

What is Preparatory Meeting?

100

The contract made between the Owner and Hensel Phelps is typically referred to as this. 

What is the Prime Contract?

100

The acronym for this is a PCCO

What is Prime Contract Change Order?

100

This is the universal title of Part 3 any Specification Section?

What is Execution?

100

The fourth step of the 6-step process

What is Initial Inspection?

200
What is Section 8 in the Book of 14?

Safety

200

The ______ is job specific and outlines administrative and operational procedures for the project.

Job Information Policy Brochure (JIP)

200

These are the two main types of PCOs

What is Internal and External/Owner/Prime?

200

This is the title of Division 01 of CSI Specifications?

What is General Requirements?

200

The name of the first step per the 6-Step QC Flow Chart

What is Purchasing Meeting?

300

What is Hensel Phelp's Safety Philosophy?

No job is so important that it cannot be done safely/

300

What section of the subcontract lists inclusions and exclusions?

What is Section B?

300

This is what ROM is an abbreviation for.  

What is Rough Order of Magnitude?

300

These are three typical types of closeout submittals.

What are, O&M Manuals, Warranties, As-Builts, Owner/Attic Stock, Owner Trainings, and Test Reports?

300

The step that is not called out in the 6-step process, but is a necessary procedure (between step 3 and step 4)

What is Material Inspection?

400

What does CARES stand for?

Craft Awareness, Recognition, and Engagement in Safety

400

This is the contract value threshold at which a bond is required.

What is $100,000?

400

During the Contract Invoice/Payment Application process, this waiver is completed to release liens for work being billed for in the current billing period. 

What is the Conditional Waiver?

400

Input from these three parties is critical when establishing due dates for the S&D Schedule. 

Who is the Trade Partner, Owner/Architect, and HP Project Staff?

400

This quality tool is designed to assist on-site personnel and senior management in assessing the Quality Control process throughout all phases of the project and is not a scheduling tool. 

What is the Quality Process Log (QPL)?

500

Safety starts with this group of the HP Staff.

What is the Office?

500

This Article in Section D outlines a trade partners contractual obligation to safety. 

What is Article 33?

500

This is the percentage threshold a Consent of Surety needs to be issued to a trade partner for combined changes.

What is 35%?

500

The number of divisions in the standard CSI MasterFormat

What is 50?

500

Formerly known as RAD, this database is located on CORE and should be utilized/referenced when building your inspection checklists.

What is Lesson's Learned?