cable routing 1
cable routing 2
bonding
bonding options
drops
100

Cable must  be  fastened  or  clipped  every  __  to  __  inches  if  routed  horizontally.

18, 24

100

Interior cable routes must maintain a minimum distance of ___ inches from any electrical wiring.

2

100

The  bonding  conductor  for  bonding  Series-6  drop  cable  must  be  #___  AWG  or  larger,  insulated solid copper wire.

12

100

The drop must be bonded directly to the main grounding electrode (i.e., ground rod) for the electrical service

Bonding Option 3

100

All aerial drops shorter than 150 feet long must be ran with what type of cable

RG 6

200

Cable must  be  fastened  or  clipped  every  __  to  __  inches  if  routed  vertically

30, 36

200

Cable route through a basement must be routed parallel or perpendicular to the floor joists, NEVER______.

diagonally

200

The bonding conductor for bonding Series-11 cable must be #__ AWG or larger, insulated solid copper wire.

10

200

The  CATV  bond  block  must  be  bonded  to  a  #6  AWG  solid  copper  conductor  or  stub  bonded to the property power grounding electrode,  if one has been made available on the outside of the property.

Bonding  Option  2

200

Drops using series-11 cable or QR-320 cable shall not exceed ___ feet in length.

300

300

All exterior entry holes must be drilled so that the outside of the hole is slightly lower than the hole on the inside of the wall to avoid what?

Water Damage

300

If running cable parallel to the joists, the cable must be attached to the?  

side of the joist

300

The length of the bonding conductor must be as short as practicable and must not exceed ___ ft. in length

20

300

The  drop  may  be  bonded  to  the  metallic  meter  cabinet  using  an  appropriate and approved clamp

Bonding  Option  4

300

_______ clamps must NEVER be placed over the lashing wire.

Span

400

Drilling should be from where for wood or vinyl siding?

inside out

400

Cable MUST ALWAYS enter the premise from below the level of the outside entry hole to prevent?

Moisture from traveling down the cable and into the premise.

400

Two ___________   must be placed on all bonding conductors (ground wire).

Do Not Remove tags

400

The  drop  may  be  bonded  to  the  grounded  interior  metal  cold  water  piping system using an appropriate and approved pipe ground clamp

Bonding  Option  6

400

Drop clearance over roads, streets, alleys; nonresidential driveways; parking lots and other areas subject to truck traffic.

18 feet

500

Drilling should be from where for metal, slate, stucco, hard asphalt, or brick?  

outside in

500

This must be formed below all outside entry holes anywhere cable enters the premise

A  minimum  diameter  drip  loop

500

 The resistance between the bond block and the property power grounding electrode must be less than ___ Ohms.  

25

500

The drop must be bonded to the property’s bonding block if a #6 AWG solid  copper  stub  bonded  to  the  property’s  bonding  bridge  

Bonding Option 1

500

Drop clearance above sidewalks or other pedestrian traffic areas

10 feet