Which work center is accessed to view service notifications?
Display Notifications
Which Symbol is used for the wildcard search in WorkPro?
% (Percent Sign)
For a lighting WR, what number should be added to references tab?
Lighting Installation Number
All Dade City work is to be assigned to _______ service area.
PCA (Plant City Area)
For a meter pole, how much is the deposit calculation per amp?
$2.00
What it the T-code for locating the service area and grid number?
ECENV_CO
Which field on the General tab is used to list details/specifics of the request?
Extra Info
Release@tecoenergy.com
For a Christmas tree stand, what are the numbers listed for the Town and Tax codes, in the WR?
12 and 12
What is the minimum voltage amount offered for buildings.
120/240
Which T-Code is accessed to add/remove an inspections required alert?
ES61
Subdivision, lot, block, amps, volts, phase, and square footage
When a customer requests to have a pole painted, what goes in the "Building" field in the WR?
Which counties do not require a government inspection for a T-Pole installation?
Hillsborough and City of Tampa
How many days from the date of the complaint being received should the Required Date be for a Complaint WR?
2 Days
In the T-code: ECENV_CO, which folder must be accessed to view the service area and circuit number?
Device Location
If a WR was cancelled during the four-hundred requirement series, the status will display?
4X
1SRC
If a customer is calling in for access or info about land owned by TECO, instead of a WR, which system is accessed to submit a request?
TEC Distribution Land Rights
If a customer calls in due to Fire taking place at their premise, what alert will need to be added to SAP?
Inspections Required Alert
Which fraction is used to indicate a lift station?
1/7
If a customer missed their Lighting appointment, A One Source TM should send an email to the LFET and CC the LFETs Supervisor with the following information:
-Name of customer
-Phone number (best time to call)
-WR Number
-Advise the customer missed their appt
How many days out from the creation date, should be the required date for a Fault Current WR?
7 Business Days
Which Requirement is added to the Work Queue, if a caller states that their pole is now up & ready?
460 - TEC Release received