Pulling OOM
Cancel Balances/Additional Cancels
Status Reach Outs
Digging In!
100

This is how you should paste your data dumps when pulling your weekly OOM file to ensure formulas and formatting remain intact.

What is Paste 123 (also accepted- paste with values)

100

These are the three key parameters we look at when identifying cancel balances.

what is % balance, HG cancel date and status

100

These are the two parameters you look at to determine a no status reach out

What is Consol Cancel date and status

100

Dig in! D56 PO 60137311

Keep- last worked 7/20
200

On a Monday what are the first 2 things you action in your OOM file

Cancel Balances and No Status Reach Outs

200

This is how you cancel a PO in MF.

F18=PO CMPL

200

This is the time frame you look at for the consol cancel date to determine which POs to reach out on

What is a consol cancel date of this week and prior

200

Dig In! D56 PO 40645887

Keep- last worked 7/21

300

These are the two additional data dumps that should be added to your OOM file, besides the OOI and Inbound data dumps.

What is the racks and Penny out list

300

This is the action used to identify additional cancels to planning in the OOM file.

What is Cancel?

300

True or False: If a PO has an upcoming consol cancel date we can reach out and ask the vendor if the POs is on track to be on time?

True

300

Dig In! D56 PO 90643371


Keep-last worked 7/23

400

This is the action you take with the Inbound Status column after all data has been dumped into the OOM file and before you begin filtering.

What is copy and paste123 your Inbound Status into your Monday Status column

400

These are the two PO statuses that we cannot cancel because doing so would cause us to lose visibility on the POs.

What are On Water and At Port

400

This is the amount of emails Adele (RPA) sends to the vendors for No Status reach outs

What is two emails

400

Dig In! D56 PO 20138887

Keep- last worked 7/28

500

This is the total number of data dumps completed each week as part of the OOM process.

What is 10

500

This is the action you take when a PO needs to be cancelled but still has keytrols.

What is penny out

500
This is how long you should wait to follow up with a vendor if they do not answer your initial reach out 

what is 24-48 hours

500

Dig In! D56 PO 90133949

Keep and look in to further