Standard Work
Takt Time
8 Wastes/CI
Miscellaneous
Final Jeopardy
100

Which Lean tool definition means "Mistake Free"?

Poke-Yoke, Error Proofing

100

The definition of cycle time

The actual time it takes the team member or machine to perform one cycle of work

100

What kind of diagram is drawn during the initial observation?

Spaghetti Diagram

100

What are the 3 methods used to achieve standardized work?

200

What are the 5 steps of 5S?

Sort, Straighten, Shine, Standardize, Sustain

200

The difference between cycle time and takt time

200

What waste is considered the worst waste as it propagates many other issues?

Overproduction

This leads to additional need for space, machines, hides defects, requires additional personnel and paperwork, creates inventory and thus higher costs and potential for injury

200

What does PDCA stand for?

Plan

Do

Check

Act

300

Besides documenting the process, name 2 benefits of Standard Work?


300

Name three causes of variation

Lack of material

Quality problems

Operator has to get their own material

No standard work

Unorganized work station

300

How often should coaching cycles be conducted?

Daily

300

What are the 4 fundamentals for OpEx

400

What are the three elements that make up standardized work?

400

Determine the lowest repeatable time

400

Name the 8 wastes

400

Explain the layered audit concept

500

Name 2 standard templates that should be used to document, standardize and sustain improvements?

500

Takt time calculation:

Length of shift: 8 hours

2 breaks, each is 10 minutes

5S activity: 5 minutes

2 shifts

customer daily demand: 500 pcs

500

Explain the graphic:



500

Name at least 6 of the 9 role modeling behaviors

500

Sustaining improvement is like maintaining this

Sustaining improvement is like maintaining a sandcastle