8a
Site Audit Completed
PTO
22
CRC
Contract Received Confirmed
What utility are we opening in Utah?
Rocky Mountain Power
ICO
Install Call Off
7a
Contract Received Confirmed
21
Inspection Complete
TDR
Temporary disconnect / reconnect
Name 2 of the smaller co-ops in TX
Pedernales, CoServ, Bluebonnet Electric, Guadalupe Valley Electric, Tri-County Electric, United Electric Coop, El Paso Electric
COP
Change order pending
13
Engineering Design Complete
Install complete
19
HO
Homeowner
When is a load calc used for?
To justify a system size when the customer has less than 12 months of usage history. Or to justify a larger system size if the customer has usage history but will be adding additional loads like an EV, pool, hot tub, etc.
CP
Channel Partner
14
Permit Sent
18
Installation
SR
Sales rep
How can you tell the difference between a load side v line side tap? Where can you find this info?
Line Side: point of interconnection is ABOVE main breaker. Disconnect is fused.
Load side: Point of interconnection is below the main breaker. Disconnect is non-fused.
Found on line diagram
BP
Build Partner
16
Permit received
Install Ready
17
VSS
Virtual Site Survey
You receive meterspot results and need to relocate the meter. The project's design has not yet been completed. What should you do if you need to notify the Engineering Team or something that needs to be included in the plans pre stage 13?
Add notes in the site approval job & flip flow status to Change Order Complete
RMA
Renewable meter adaptor