Abbreviations
Abbreviations
Kickback Reasons
Kickback reasons
Miscellaneous
100

DQ

disqualified

100

AEP

American Electric Power

100

You select the incorrect inverter on the equipment section of the ICA app, it does not match the inverter being used on the engineering plans. What kickback reason should you use to log this in Salesforce?

Data Entry

100

The utility rejects your ICA app because the AC disconnect switch manufacturer is missing on the one line. What kickback reason should you use to record this in SF?

Engineering - One Line

100

MEC

Mohave Electric Co-op


200

TDR

temporary disconnect reconnect

200

SR

Sales rep

200
The utility emails you saying that the customer has another application with another contractor in their system & we cannot proceed until the customer contacts the utility to confirm they want to proceed with Palmetto.

Customer Issue/Hold

200

The utility rejects your ICA app because the system is oversized. What kickback reason should we use in SF? 

System size

200

Who is the VP of Policy?

Ryan Barnett

300

SDG&E

San Diego Gas & Electric

300

PV

photovoltaic

300

ESID is missing from the site plot. What kickback reason should we select in SF?

Engineering - Site Plot

300

The utility rejects your ICA application because the the customer's feeder in that area is full and they are not offering any upgrade options at that time. What do you do? What kickback reason should you select? 

Open a retention case. Transformer Upgrade.

300

What team is responsible for document collection?

Origination team

400

TEP

Tucson Electric Power

400

NEM

Net energy metering

400

You need to submit HOI with the ICA submission. The HOI is set to expire in one week. What kickback reason should you select now that you need a new HOI than what was originally collected by the CRC team at POS?

Incorrect CRC documents 

400

The utility says that they cannot proceed with your ICA app until you provide them with the DocuSign signature summary page for the ICA agreement. What kickback reason should you use? 

New Document Required

400

Who is Sean Hayes?

COO

500

SRP

Salt River Project

500

HOA

Homeowner's association

500

The customer signs the name on the ICA agreement in another name than what is on the UB. The utility kicks the app back & wants the customer to sign in the exact name as on the UB. What kickback reason should we use? 

Incorrect Customer Signature

500

A transformer upgrade is required in order to proceed. What kickback reason do you select? What is your next step here? 

Transformer upgrade. Ask utility for a quote for the upgrade & provide to the FT team once received so they can communicate to the customer & confirm if they want to proceed with the project 

500

RMP

Rocky Mountain Power