EXXON
H&P
SAFETY
Rig Knowledge
GENERAL
100

When H&P was founded?

1920

100

Highest allowable H2S atmosphere for H&P employees to perform work in without SARs. 


10 ppm

100

How many volts run through top drive cables?

600 volts

100

how many bolts does our 12 inch flow line have?

12 

200

What is the WOSP? 

Standards and guidelines between H&P and ExxonMobil 

200

the process was created to share successes and process improvements on projects across the organization. When we can share learnings from past projects, everyone benefits and learns what to implement or do differently next time around.

 After-Action Review (AAR)

200

What is the max torque you can pull with the rig tongs?

65,000

200

how many accumulators remote(s) does the rig have and where is/are located?

two

drillers cabin and in lubster skid

300

How many active H&P rigs are currently working in the west Texas distract?

94 rigs

300

What is the total height of the mast? 

134.5 ft

300

What is the most common ring that we use on the CHOKE LINE?

BX 154

400

is to ensure high risk activities are completed without injury to personnel or damage to equipment or the environment.

Permitted Operations Management System (POMS)

400

What is the pounds per foot of are drill pipe?

16.6 lbs/ft

400

What is the primary purpose of a Variable Frequency Drive?

The primary function of a Variable Frequency Drive (VFD) is to control the speed of electric motors

500

What company did H&P recently acquire and how many rigs did it add to are fleet?

KCA Deutag adding 129 rigs

500

What is the max wind villosity rating for the mast with and without drillpipe?

NO drill pipe 93 knots ( 107 mph )

With pipe 70 knots ( 80 mph )

500

WHAT SIZE ITS OUR DRILL LINE?

1 3/8 IN