This splice for Line 1 generated 52.04 msf of waste while its counterpart generated 34.69 msf.
What is bottom splice?
At 289.46 msf for Line 3, this board type has generated the most dry waste.
What is 5/8" FCTE 48"?
The quality department plays a large roll in helping diagnose this type of waste.
What are defects?
This part of the plant has been recently replaced to prevent rain damage to Line 1 Products.
What is the roof?
Mill operates must take time to go to another location due to this being out of order.
What is the mill office bathroom?
At 129.80 msf for Line 3, this waste involves too much exposure to heat.
What is burned board?
This popular Line 1 Product has generated 3.89 msf of waste.
What is 5/8" Baseboard FCX SE 47 3/4".
The scalehouse operator having to track down a sample form crusher, pile, and pits.
What are the siloxane containers?
Specialty operators have a hard time placing the this object due to the current catwalk layout.
What is the laminate roll?
At 25.20 msf of waste for Line 3, this type can occur when the slurry isn't full enclosed.
What is open edges?
This new product has generated 21.04 msf of wet waste.
What is 1/2" Ultralight Tough 48"?
Recrushing sidewall rock due to temporary fixes in the AG Plant.
What is extra extraprocessing?
This equipment recently got a large overhaul to increase its efficiency and reduce time spent on maintenance.
What is the Kettle?
Considered by some to be the biggest waste in the loading department.
What is paper usage?
At 63.96 msf for Line 1, this waste is generated when production switches from one edge type to another.
What is Edge Formation Changeover?
At 0.78 msf for Line 1, this product has generated the least dry waste.
What is 5/8" Glass Mat VHI Interior?
What is overproduction?
This project aims to eliminate the need for a Line 1 operator to place a label on a finished stack of drywall, eliminating some Non-utilized talent.
What is the Print and Apply project?
These can often delay planners in scheduling work orders as they have to wait for clarification.
What are under-detailed work requests?
At 0.10 msf, this is the smallest wet or dry waste type generated between both lines.
What is edge formation paper for Line 3?
The grand total of this kind of waste for both lines is much closer together than the other kind.
What is the wet wastes?
Likely the most common waste that the engineering department faces.
What is waiting?
These can be caused by not monitoring the moisture content of gypsum before it enters the mill.
What is processing delays and poor calcination?
These people cause waiting to be one of the engineers biggest wastes.
What is Contractors?