Component Sign In
AQL
Log Book
Component Sign In Pt. 2
Extra Credit
100

How do we verify that we have the correct MIC

W.O & LOT Code

100

what is mid case? & who uses it?

the middle shipper & Quality

100

Where do we find bulk item number

BOM

100

How many containers do we highlight the LOT code on when signing in Bulk

All containers

100

What is Thomas' last name?

Dinovo

200

Who signs for Bulk during Sign IN?

Quality & Line Lead

200

How many steps are there to the AQL card?

4

200

Where can we find AP Numbers for our machines

RED Plaque / Yellow Sticker

200

True or False: When verifying quantities, we NEVER open partial cases, we take the number written on the box

False. Always open ALL PARTIALS to verify the correct component and quantity

200

WHAT 2 WAYS CAN WE READ TEMPERATURES?

TRIDIUM & HYDRO-THERMOGRAPH

300

Explain what to highlight when signing in BUlk/WIP

Bulk Lot Code

300

What type of AQLs do we use the tally sheet for?

Hour by Hour

300

True or False

We have to manually document auxiliary equipment on the line. 

Ex: Lit scanner, Scales, Vision Hoods, Conveyors, Labelers, etc.

True

We document any machines that are added to the line.

300

How many containers do we highlight the LOT code on when signing in WIP & where are those containers located on the pallet ?

2: Top left & Bottom Right

300

While filling out your logbook, who do you contact if you find a calibration due date expired?

Supervisor/lead and Maintenance

400

Who signs for 100% and who signs for 200% in the component sign in process

100% -Line Lead 

200% Team Lead/Supervisor 

400

True or False: 

We use the highest AQL percentage to verify if sample size changes

False

We use the lowest AQL percentage

400

What Item Number do we document when filling out the Log Book?

Bulk Item Number

400

What stamps do we use when Signing In Components?

Materials Verified 100%

Material Verified 200 %

400

Who performs and verifies start up challenges in a LOT IN ?

Line Lead & Maintenance 

500

Multiple Choice : We need label copies to sign in what component?

A. Blank Shipper Labels

B. Bulk

C. Shippers

D. All of the Above

C. Shippers

500

True or False: Sample size can go down but NEVER up

False

500

what other logbooks are required to be signed in?

Area Logs, Machine logs, and Vacuum Log (if needed)

500

GO to the board and Draw the stairs for component sign in


THREE TIMES POINTS X3

(OTL determines if this answer is correct)

500

WHAT DOES AQL STAND FOR

ACCEPTABLE QUALITY LIMITS