First Piece
Serialization
JDE
Extra Credit
Extra Credit Pt. 2
100

Who signs for First Piece & How long do they have to come do it ?

Line Lead & Quality 

Quality has 15 minutes to sign 

100

What is the flow of communication (order) between serialization equipment

MTS - STS - HTS - PTS

100

IN JDE Where do we go to create pallet tags ?

Production Completion

100

What happens if Quality doesn't sign for First Piece in the required 15 minute time period ?

You break down the first piece shipper and start over 

100

When entering scrap, do we enter a negative ( - ) or positive ( + ) number ?

Positive, because we are adding to scrap

200

What needs to happen with the First Piece shipper label before it is read?

Reject it 

200

True or False: When rejecting product we need to see the status change from red to green once in the "Identify" tab on screen 

 False

200

In JDE the "Reason Code" is what

The Pallet Number

200

What happens if a Lead/Supervisor doesn't sign for First Piece in the required 1 hour time period ?

Shut the line down 

200

True or False : Reconciliation is a form of accountability

True

300

If you are not the Line Lead who performed the Component Sign In, What is required before signing First Piece?

Verify Component Sign In was complete and Verify Labeling is correct on all components

300

How do we identify a misalignment 

The Pallet Builder will show a different number of shippers scanned than what is present on the current pallet 

300

True or False: Non-Serialized Pallet Tags Are Auto-Generated 

False

300

Who verifies that First Piece has been performed? How long do they have to come do it ?

Team Lead or Supervisor & 1 Hour

300

When do we take accountability ?

Beginning of Shift, End of Shift, and whenever we get small pulls of product 

400

What is a First Piece In-Process Check ?

A Quality Check done before First Piece

400

Multiple Choice: Top View is associated with what part of serialization?


A. MTS

B. PTS

C. HTS

D. STS

E. Both B&D

F. Both A&C

E. Both C&D

E. Majority of the time it is HTS but in certain circumstance it can also be STS

400

What is a Work Order Analysis used for?

A list of the required components and amounts needed for the entire run 

400

True or False : When reading First Piece you DO NOT read empty spaces, semi colons, or parenthesis 

False, you read each and every character individually including letters, numbers, spaces, and all punctuation marks

400

Who reads & signs for the Ready to Run Inspection?


2 Line Leads

500

How long does Quality have to come sign for first piece?



1 hour

500

How many different machines are associate with MTS

3

Antaris, marchisini, Onmi

500

If you enter the wrong quantity on a pallet tag, How do you fix it ?

Enter a Negative ( - ) quantity for that pallet tag . Then create a new one 

500

What are the colors associated with Serialization & what do they mean?

Red - Rejected

Green - Verified

Grey - Assigned/Not Assigned or Loading

Blue - Packed 

500

What does MTS/STS stand for 

Master Tracking System & Slave/Secondary Tracking System