BP, MB, & TH stand for
Backplane, Motherboard, Testhead
the tool _____ is used to test xIUs in PCM, that we have ______ (#) of
PMM, 5
RO stands for: ________ and it means _________
Repeat offender - the xIU came down for the same fail multiple times within 1000 TDs
You go here to see the list of xIUs that are Incoming/Outgoing
(shipping table at the bottom of) Fuzion
Number of days you have to complete your LV1 PCM certifications (according to upper management) after you start on your shift
30
The 'tag' that's used to assign an xIU name to a card, that the PMM reads to identify it
RFID tag
3 workstations PCM MTs can use that are currently on the floor *****Bonus: if you can list 5*********
LCAS, PRIus, OPRS (+ soldering & lapping)
the Bin that is considered the 'equivalent' to EZA NAPT
Bin 15
NFV and RFV stand for:
New From Vendor, Returned from Vendor
________ is the first certification you should focus on getting after you completed your PCM LV1 certs (unless specifically told otherwise by your manager)
PRIus & PCM LV2
The technologies that need fiducial alignments when putting TH onto the MB are ________
MF technologies (FFI)
the 3 station names at the PMM
Station Controller, Tool Controller, Vision Controller
The order of SPECs/SCIs you follow to find RFCs pertaining to H68?
***Bonus*** what do you do if you can't find your answer in those Specs
DoW36 SCI --> DoW36 main --> TP SCIs --> TP main
***Browse through the General PCM Die Sort Specs, or Advanced Specs... lastly you escalate to SR. Tech on shift or ENG****
Where you can find the shipping doc that you should definitely reference (besides SPEC) when performing shipping procedures, and what its known name/title
Fuzion ('Shipping BKMs')
request training on _______ during your shift in order to be ready for your PCM LV2 certification (in other words, _____ was not covered in Cert Lite but is part of PCM LV2 cert)?
DMM - Digital Multi Meter testing of capacitors and resistors (for when you have CAPLEAK fails)
the _________ procedure must be performed before you can do a MF (FFI) TH swap
"Probe floating"
the PCM tool(s) that are used to check NFs and XY fails
PRIus/OPRS
Per DoW36 Spec ELEC failure RFC, you can waive a 'new' or inconsistent ELEC OL unless you have done what during your RFCs?
TH removal (typical performed for split clean procedure/VI of cpst & DE)
5 things you do if you are performing Incoming/Outgoing procedures, and during your VI you notice something doesn't match up with Pulsar/wasn't previously documented in card history
Stop the job, comment in MES, update Pulsar to match what you see, log the card to EngHold, and NOTIFY/EMAIL THE PO
use this to convert the SWAT*** fail codes into POIs/failing channels (name two options)
Pulsar or TTB files (+ 'PinDef' files)
The BP connects to what when running in a cell?
to the HDMT connectors
the weekly for PMM(s)______ is YOUR shift responsibility
SH4: SH5: SH6: SH7:
Bin 8 RO card is now passing, so it gets logged: ________
ENGHold
The document (its known name) that you HAVE TO review while performing Incoming from vendor that gives you a risk assessment of the product
CAN docs
you log a card to WaitingMetrology for "___________" when a card is __________ (what type?) of Incoming
"preconditioning" and "New from Vendor"