Reinforcement
Joints + Forms
Slab Prep
Barriers + Pipes
Mix and Timing
100

This must be elevated on chairs in the top third of the slab. 

What is welded wire mesh?

100

These must be braced or tied together to maintain the design shape. 

What are foam boards? 

100

These must be clean, straight, and square before concrete placement. 

What are footing trenches ? 

100

These must be sealed with proper tape before concrete placement.

What are vapor barrier seams and penetrations. 

100

This is the minimum concrete strength required unless otherwise specified by the EOR. 

What is 3000 psi? 

200

This cannot be used as the only reinforcement method 

What is fiber mesh?  

200

This is required when flatwork is confined on two or more sides. 

What is an expansion joint? 

200

This must be placed deep enough so it does not reduce slab thickness. 

What is electrical conduit ? 

200

These must be wrapped or sheathed where they pass through concrete.

What are pipes passing through concrete ? 

200

This is the PCS limit for water added on site per cubic yard. 

What is no more than 1 gallon per cubic yard?

300

This must be maintained around all reinforcement in the slab. 

What is minimum concrete cover?

300

These must be cut or tooled within 24 hours on non-post -tensioned slabs 

What are control joints? 

300

These areas must be backfilled and compacted before the pour. 

What are plumbing, electrical and chases? 

300

This must be built into a foundation wall when a pipe passes through it. 

What is a sleeve ? 

300

This is the maximum time allowed for concrete discharge after water is introduced to cement. 

What is within 90 minutes?