Scheduling
Estimating
Production Tracking
QA /QC
Financials
Project Shares
100

The type of relationship where one activity beginning depends on another activity completing.

What is Finish/Start

100

The process of contracting with trades.

Buyout

100

The location where production tracking is shown.

DOMO

100

The last step of the procurement process.

Material Verification

100

The amount of dollars available to spend, or forecasted to be spent in a particular place.

Budget

100

The project with 60+ custom condos.

The Phoenician (C2)

200

Each schedule should have 2 of these for each month of construction.

Milestones

200

The software that's used to communicate with subcontractors during the bidding process.

Building Connected

200

The location where production tracking is entered.

CMIC


200

Meeting held to set quality expectations with a new product installation.

First Work in Place Meeting

200

Actuals once billed has occurred by Subcontractors, Vendors, Layton Payroll, etc.

Cost

200

The project that never finished and also never started.

One Camelback

300

The document provided to the scheduler 24 hours ahead of the schedule update meeting.

The Pre-Update Form

300

These are items that are not included in the contract but have been priced for the owner.

Alternates

300

This who should be doing production tracking.

Everyone

300

The first step in our Commitment to Quality.

The Pre-Award

300

The tool to forecast Div 1 Layton Labor.

GC Monitor

300

Project Blossom.

Lego TI

400

The first schedule on a project.

What is the baseline schedule?

400

Precon uses this tool to level scopes.

Bid Tabs

400

The tab within the Daily Journal that is used to enter the today's quantity complete.

Units Complete

400

The ideal result of continuous quality inspections throughout the duration of construction.

Zero Punch List

400

External adjustments to contract value.

Owner Change Orders

400

The project with canal utilities and underground tubes.

Lakin Park

500

The item used to document potential schedule impacts.

What is Delay Fragnet

500

Supplemental information is provided to subcontractors through this document.

Instructions to Bidders

500

The type of units determined by the scope that's being tracked.

Metric

500

The studying of plans, specs, submittals, scopes, and special AHJ requirements to ensure what is drawn can be built.

Constructability Review

500

The column on the forecase report that shows remaining dollars "committed" to a trade partner via a subcontract.

Open Commitment

500

The project with a Kaboom Room.

Fender