100

A permit is not valid until this happens

What is payment of fees?

100

This plan shows lot dimensions, setbacks, easements, and building location.

What is a site (plot) plan?

100

Permit valuation is typically calculated using square footage times this.


What is the valuation factor?

100

This inspection occurs before concrete is poured.


What is footing and foundation inspection?

100

The minimum required distance between a property line and building line.

What is the setbacks?

200

The Building Official may suspend or revoke this document if issued in error.

What is a Certificate of Occupancy?

200

These drawings show the exterior appearance of a building.


What are elevations?

200

When totaling valuation for fee calculation, you always round?


What is up?

200

Does the inspector prefer to have all roughs called in at the same time?

What is yes?

200

An accessory building must generally be separated from the main building by this many feet

What is 10 feet?

300

This IBC chapter covers Administration

A. What is Chapter 2?

B. What is Chapter 1?

C. What is Chapter 12?


What is Chapter 1?

300

The difference between habitable and occupiable space is found in this IBC chapter.

A. What is Chapter 2?

B.  What is Chapter 17?

C. What is Chapter 10?

What is Chapter 2 (Definitions)?

300

Plan review fees are commonly calculated as a percentage of this.


What is the permit fee?

300

Does the framing need to be inspected before drywall is installed?

True or false

What is true?

300

This board hears appeals and variance requests.

What is Board of adjustments?

400

Work done before a permit is issued may result in this additional fee.


What is a work commencing (investigative) fee?

400

Roof trusses should NEVER be modified in this way.

What is cutting or notching?

400

Who determines the final building valuation for fee purposes?

Who is the Building Official?

400

This needs to be on site during the entire project and available at each inspection

What are stamped drawings?

400

A lawful use that no longer conforms to zoning regulations is called this.

What is non-conforming use?

500

It is the duty of this person to request inspections?

Who is the permit holder?

500

Does the type of construction determine the building type?

True or false

What is true?

500

$500
If a 1,500 sq ft dwelling has a valuation factor of $100/sq ft, the valuation is:

 What is $150,000?

500

A temporary certificate may be issued if this condition is met.


What is the building can be occupied safely?

500

Home occupations are typically limited to this percentage of the floor area.

What is 15%?