1 x 6 Flat Bar $7,050
Various Square Tube $1,200
Wherever you used it! Any logical answer except 00.708 "Repair Other" Wins!
New Soft Start/Benshaw for Primary Crusher
00.701
Please utilize 00.727 for generic electrical like ground test, lighting
Manlift for all year
Doesn't matter - Call James & Erin
(CT 28)
Hauling Shot Rock to the Primary
00.232 Hauling
No more 00.230 Material Transfer PLEASE!
Mag Drill & Slugger Bits $2,000
Please don't say repair other
Hardox $3,323
TODD!?
Mowing for scalehouse/property entrance
00.830.01 Site/Rd Maintenance Entrance is Preferred
000.830 acceptable, but tends to be a catch all just like repair other
Gloves, Hi-Viz, Hardhats
CT 40 Supplies
Phase safety/health supplies 00.880
Loading Shot Rock In The Pit
Pit Loading 00.231
Assorted Tool Order From Motion
PLEASE ANYWHERE BUT REPAIR OTHER
Where are the bulk of the tools used? Crusher Repairs? Conveyor Repairs? Facebook Marketplace?
"All Visitors Must Stop To Check In At The Scalehouse" Signage $360
00.030, 40
00.830, 40 Site/Road Maintenance
00.880, 40 Safety/Health Supplies
Standard screens for any screen deck
00.705.01 Screening Media
Secondary Breakage
25 Subcontracts
(Phase 00.240 Secondary Breakage)
28 Equip Rent/Lease Short Term is used for equipment only, not equipment & an operator
Changing screens in the morning, then plant utility remainder of the day
00.705.1
00.502?00.503? Tertiary or Secondary Crushing? Some 500's phase code. Stay consistent for the plant. NO 00.508 OTHER PROCESSING
Will accept 00.705 as an answer, most important thing is the time gets separated.
Who is to blame for approving coding to repair other?
John & Andy - Lazy!!!
(Don't get mad at us this year when we reject things and ask for different coding)
Some larger locations have approvers before us - please double check before approving Repair Other.
Liquid Heat $506
Digital Multimeter $141
00.506, 40 Conveying Supplies
00.706, 30 Conveying Parts
00.727, 30 - or Whatever you're using it for! Conveyors mostly? 00.706 Screen motors? 00.705
Propane/Natural Gas/Heating Oil for the crusher shop
00.660 Energy-Purchased CT 64 Utilities - Bldg Oil
Radiator clean/pressure test/repair dropped off at a shop
32 Outside Repairs
Processing Rap
00.500.1 Processing-Rap FOR EVERYONE
Plumber Called For The Scalehouse Toilet $1,100
(Big Mess)
00.030, 25 Scalehouse/Subcontracts
00.720, 32 Repair Scales/ Outside Repairs
Ear Plugs, Hammer Drill, & Drill Chisel Bits For Frozen Winter R&M Work
Please charge it all to 00.706, 30 (00.705 for screen work, 00.701 for primary crusher)
EXCEPT the ear plugs get charged to 00.880, 40 Safety & Health Supplies
Primary Crusher Manganese Liners
Tertiary Crusher Manganese Liners
00.701.1 Repair Primary Manganese
00.703.1 Repair Tertiary Manganese
Natural Gas OR Building Heating Oil/Propane
CT 63 Bldg. Electricity
CT 64 Bldg. Oil
Moving Agg from stockpile to Asphalt Plant
Crusher, 00.509 Stockpile
Crusher, 00.509.01 Stockpile to HMA
12" Pipe For New Dewatering Pump $4,500
00.707, 30 Wash Plant/RM Parts
00.250, 40 Pumping Supplies