Coms and Data
Emergency Response
Market Constructs
Generation Operations
Extra Fun
100

The threshold for having a satellite phone

what is 500 MW

100
Heavy Load Voltage Schedules are implemented after this amount of hours

What is 4 hours?

100

This is not considered when clearing the DA Market in PJM

What is PJM Load Forecast?

100

Severe cold weather requires what generators to be staffed, started, and available for loading

What are Combustion Turbines and Diesels?

100

The minimum requirement for Black Start units runtime

What is 16 hours?
200

The cost signal PJM sends to generators to provide direction for increasing / decreasing output

What is Dispatch Rate?

200

The most effective operating point for generators providing regulation during system restoration

What is the middle of their regulation range?

200

A fuel limited unit is bid into the DA market in this manner

What is Max Emergency?

200

A fossil steam unit will be considered fuel limited resource when bidding in the DA when it is not capable of running at max output for this number of hours.

What is 72 hours?

200

Regulation requirement for PJM Balancing area during on-peak hours

what is 1% of forecasted load?

300
PJM will switch to these control signals when their Primary Digital control signals experiences problems.

What are Analog/ manual control signals?

300

During minimum generation conditions, this can be experienced in addition to having excess generation online.

What is high voltage?

300

PJM does the following to avoid dealing with economic issues during transmission related constraints

What is cost (offer) capping generation?

300

To maximize MVAR output utilizing a generator's D curve, this action may be taken

What is decrease the MW output of the unit?

300

The amount of load needed to be shed in order to attain an increase in frequency of 1 Hz

What is 6% - 10 % of load?

400

A Maximum Generation Emergency Alert will prompt PJM to request this.

What is a Supplemental Status Report (SSR)?

400

Member actions during Heavy Load Voltage Schedule warnings.

What is Reactors out of service, capacitors in service, and voltage regulators in service?

400
This is considered while forecasting load.

What is weather and day of week?

400

PJM will call this action to recover ACE so tie line schedules can be maintained.

What is deploy 100% Spinning / sync?

400

These three items need to be within tolerances before a TO can sync with an outside entity during system restoration.

What is Frequency, Voltage, Phase Angle?

500

PJM needs to be updated this often when a data link is down.

What is 30 Minutes or agreed upon change?

500

Triggers of Conservative Ops

What are fuel delivery issues, natural disasters, environmental alerts, GMD, terrorist or sabotage threats?

500

Generator owners need to report restoration information via restoration form online this often.

What is hourly?

500

Lagging phase is when current is...

what is inductive?

500

An emergency alert that prompts Generation Owner and Operators to submit emergency reducible information to PJM control center and the needed criteria!

What is Min Gen Alert and when expected generation levels are within 2500 MW of normal gen limits?