Loss of Seal Oil
Anhydrous Ammonia
Major Natural Gas Leak
Loss of Station Service
Franklin Fruit Jar
100

Allows generator to be purged to CO2 with minimal staff

What is OIP.

100

Meaning of "Anhydrous" 

What is with out water

100

Four locations of "Hazardous Gas Sensors"

What are gas compartment, turbine compartment, top hat, and collector cab

100

The source from which normal power is fed into the plant.

Station Service

100

WO status that only you can plan, schedule,  and workflow

What is SOPLAN

200

Is the CT speed at which OIP will start cycling through purge logic

What is ~42 RPM

200

OSHA Permissible Exposure Limit on 8 hour average

What is not to exceed 50ppm

200

The process used in which to make gas lines safe for cutting and welding

What is "Natural Gas Purge Procedure"

200

Approximate time of DC power with loss of station service

What is 4 hours

200

Operator must update when unit status changes

What is SYSTAT

300

The first valves to actuate in the OIP process

What are 20HH-1 & 20HH-2

300

NIOSH 8 hour average Immediate Dangerous to Life and Health (IDLH)

What is 300ppm

300

The haz gas level at which preparations should be made to take the CT off

What is 25% LEL

300

The name of the 25KV feed into the plant.

Construction Power

300
Operator response to a NERC relay rolling

Identify which relay/lock-out acted, document relay information (picture), notify on-call management, investigate cause.

400

20PM-3 CO2 fill valve shuts during the OIP process at 

What is 28 psi

400

Is the chemical combination of Anhydrous Ammonia

What is one part nitrogen, three parts hydrogen

400

Responses to high (10%-25% LEL) haz gas alarm in turbine compartment

What are notify outside operator to begin investigation and swap turbine compartment fans to verify that both sensors see it

400

How reserve station service can be swapped from white line to black line

What is OPEN 446 and CLOSE 556

400

Operator reaction to emissions excursion

What is reduce load as needed to control emissions, contact on-call management, Fleet, and CO&T. Document in log book

500

Acceptable level of H2 in CO2

What is <4%

500

SCG procedure requirement for leak investigation

What is: 2 people, portable NH3 monitor, proceed from up wind, and discontinue if concentration exceeds 250ppm

500

Response to major gas leak upstream of the filter separators in gas yard

What is: If safe to do so and will stop leak, isolate individual trains. If local train valves will not isolate the main valve at the tap station will have to be closed. Notify SoCo Gas, On-Call Management, Fleet and CO&T. Secure units. 

500

How reserve station service is fed to Unit 3

What is from Unit 2 4160v frame 1B to Unit 3 4160v frame 8

500

Reverse power relay fails to take out the ST generator with valves closed, this happens next

What is breaker failure