Configuration
PLM
Change Process
Systems
Personnel/Misc
100

What are the only type of ASY’s that do not require to be converted to the MBOM?

Purchased ASY’s

100

Which UOM can be used on Phantom?

EA

100

Who should you be taking implementation requests from?

 PMI Program Managers

100

What does MES stand for?

Manufacturing Execution System

100

What should you do before requesting PTO?

Confirm who will be covering for you

200

How do you create an MBOM from a new EBOM?

Press the Convert button from the EBOM Screen

200

When changing pedigrees via a CA what needs to be done to the old pedigrees?

Dispositioning

200

What is a discrete list of components that drives consumption?

A Work Order

200

Where should we implement coordinated Changes?

Change Master

200

What are the core hours that everyone should be present in the office?

10am to 2pm

300

Never do this unless a part is set out in the future.

Hard Delete a part from the MBOM

300

When should an engineering vs. production implementation route be used?

Engineering should only be used for Pilot Releases, Production is used for any Production releases or Structuring changes.

300

Deviations should always be added to the MBOM with the production intent part returning after the deviation end date except for what situation?

When the production intent part is structured as a child of the reworked part

300

Where does the SIE Team create Supplier ONLY Deviations?

Supplier Portal

300

If you are super busy and you get an urgent request what do you do?

Spread the love – Send an email to the team and ask for some help

400

When should you approve a CA as ‘Implemented’?

When the entire change has been updated to the MBOM or Skipped per another CA

400

Name the 5 Product Development Build Phases.

Alpha, Beta, RC, Pilot, SOP/Production

400

What is the difference between a Purchased part and a Subcontracted part?

Both are purchased from supplier but Tesla helps to supply a part or parts to the supplier for Subcontracted parts

400

Where can you find what change orders any given part has ever been on?

Change Management Tab under any part in Enovia

400

How do you know who to contact for issues regarding a program or product that does not belong to you?

Look up the Part System in the Points of Contact on our confluence page

500

What should you do if you need to insert a part between an already published change.

Create new session, Split out current new part to new session, add insert on old session

500

Provide 3 examples of when a route should be restarted

  • Fit, Form, Function
  • Process change – Manufacturing process or vendor process
  • Material change
  • Vendor change
  • Any parts needing traceability
  • Change affects safety parts
  • Not upward compatible with parent
  • Tooling
  • UOM – Unit of Measure
  • Intent of the CA or Any additional parts added or removed to EBOM or CA
500

If a deviation is being requested to add old material found in the warehouse back to the MBOM, what do you do?

Push back and tell them to use an MES/MOS deviation or reference the old CA to add the material to the MBOM

500

What do you use the Master Data Function/Part Maintenance for in WD? 

Adding/removing program tags, Adding/removing Part Settings ( VC, Bulk, purchased, Fabricated)

500

What 3 reports should you be running every week?

Tasks to be Accepted, CA's/DEV's Pending Approvals & CA's/DEV's pending implementation