100

In LD+, users can ONLY assign general RFI’s (Request for Information), not to a designated area or sheet. True or False?

False

100

Name (3) manual controls that can be used with myRoom?

Answer (a lot): Palladiom, seetouch, pico , grafik eye.

100

What resource is available to the installer to support network questions?

Network Implementation Guide

100

Where can we indicate notes for a project for future reference in MPM+? (List at least 2)

Description in task/project tab (check to confirm)

Upload files

Chatter on the right side of the project

100

When should the PM engage with the installer regarding the network (planning, start-up/installation, and go live)?

To begin at HFR hand-off

200

In LD+, are you able to have multiple load numbers (switch-legs) on the same zone designation?

Yes, you can navigate to the "zone" feature (located in the top right corner) and manually assign the zone.

200

Does myRoom have Vue?

Answer, yes there is a Vue License

200

A project requires the Lutron system to integrate with a Mecho shade system using a Mecho MNI interface and Lutron Quantum NWK interface. Which document can the AV integrator use for finding the correct TELNET commands?

Lutron Integration Protocol

200

How should a resource track their time when working on a project task?

List times worked per day under the related tab in the project task

200

A customer is requesting the status of an order. Where can you find this information?

myOrders

300

How can one immediately navigate to a desired area in classic view?

Select the desired area on canvas view before switching to classic view

300

Can you have both wired and wireless sensors adding to Guest Presence Detection?

No

300

A BACnet integrator is requesting what points will be available from the Quantum system. What two documents should they reference?

BACnet PIC Statement for Quantum Area Virtual Devices

BACnet PIC Statement for Quantum Subsystem Physical Devices

300

How should a resource track the status of a task in progress?

Stage & percentage complete (mark complete when finished)

300

Where can you access the lead times for equipment before receiving the PO?

Lead time generator tool

400

What happens if you open a Designer file in a previous version of the software than it was saved?

The software will crash; the file will not be able to open.

400

What are the three inputs for Guest Presence Detection?

1. Occupancy as sensed by the T-stat or additional sensors

2. Keypad button presses

3. Door contact

400

The electrical drawings require a central override manual control for all floors in the building's security office. What Quantum subsystem design requirements need to be considered?

Both the manual control and controlled lights need to be in the same subsystem

400

What dashboard tracks the metrics for all international projects?

International Project Manager Dashboard - 2021

400

Where should an HFR/PO be stored so that it can be accessed for future reference?

In the Orders folder in the S:// drive labeled as either "REL" or "HFR"

500

Similar to our CCP Panels, our Athena DIN Rail panels in LD+ can only be customized in "Classic View." True or False?

False. Our Athena DIN Rail Panels can be customized in canvas view and classic view, by double clicking the panel with your cursor. A pop-up screen will populate, which will allow you interactively to change the panel size, module type and more.

500

Name two systems we integrate with for myRoom Plus?

Answers could include at least these:

Property Management System (PMS) Oracle, HTNG, Infor, Protel. Etc.

Building Management system (BMS) BACnet

Central Locking System (CELS) Salto, Vincard

Hotel Operations: HotSos, Alice

500

A customer wants to use a secure (multicast communication will be blocked external to the building) remote virtual server to host the Quantum system. What network communication protocol needs to be configured for the subsystems?

Unicast/TCP to the master processor in each subsystem

500

What are the top (3) items that need to be complete during the creation of a project?

Attached PWO

Attached Opportunity

Target Release

500

When compiling and/or reviewing a submittal, are area functions required for all rooms included in Lutron's scope?

No; standalone spaces do not always require areas to be drawn.