What in tarnation? I need a modification!
Did ya build it right? (QA)
Is it dead yet? (closeout)
Did I booger it for the last time? (termination)
What does that mean? (definitions)
100

These are the two types of contract modifications

What are Unilateral and Bilateral?

100

The Government relies on this system to ensure quality of commercial items.

What is the Contractor's existing quality assurance system?

100

This is the type of contract that should be closed immediately after receipt of property and final payment

What is a SAP contract?

100

This type of contract termination allows the Government to end a contract when it is in the Government’s best interest, even if the contractor has done nothing wrong.

What is termination for convenience (T for C)?

100

This is the primary mechanism to update, amend, or revise an existing contract after it has been awarded.

What is a modification?

200

This is the form used for solicitation amendments and contract modifications

What is an SF30?

200

This document is prepared by the Government to outline how quality assurance will be performed, including inspection methods, frequency of checks, and performance standards for contractor work.

What is the QASP (Quality Assurance Surveillance Plan)?

200

This is the FAR part that covers closeout

What is FAR part 42?

200

A contractor hired to knowingly misrepresents their costs, and fails to perform the work. The Government chooses to pursue this legal action.

What is termination for cause?

200

This is a defect which exists at the time of acceptance 

What is a Patent Defect?

300

If the total value adjustment of a contract is over this value, a certified cost or pricing data letter is required

What is $2.5 Million? (truthful cost or pricing data act)

300

During Government inspection of a delivered system, inspectors find small cosmetic scratches that do not affect function. Under FAR Part 46, these are classified as this type of defect, which usually does not justify rejection.

What is a minor defect?

300

This is the amount of time in which indirect cost rates should be settled after physical completion. 

What is 36 months?

300

This is the formal notice issued to a contractor when they are behind schedule or otherwise failing to meet contractual obligations under a termination for default.

What is a Delinquency Notice?

300

This is when the Contractor has completed all required deliveries & items have been accepted by the Government.

What is Physically Complete?

400

This is the citation for the changes clause

What is FAR 52.243-1?

400

After acceptance of electrical control panels, failures occur months later due to degraded internal wiring insulation that could not have been discovered through reasonable inspection at delivery. The discovery of this item in FAR part 46 allows the Government to seek remedies despite prior acceptance.

What is a latent defect?

400

This is the amount of time Contractors must retain contract files for.

What is 3 years?

400

A contractor is hired to develop night vison goggles for troops but provides the Government with broken sunglasses. The Government will pursue this legal action.

What is termination for default?

400

This type of delinquency notice occurs when there are less than 10 days remaining in the contract, asks KTR to provide evidence as to why they should not be terminated

What is a Show Cause Notice?

500

Under FAR 43.102, this action may be required when an unauthorized Government representative directs a contractor to perform work, and the Government later chooses to approve it.

What is ratification?

500

A contractor delivers 10,000 identical fasteners. Inspecting all would be too time-consuming, so the Government QA team tests 1% chosen by a lottery method. This FAR Part 46-approved method provides reasonable confidence in lot quality while saving time.

What is random sampling?

500

The FAR requires verification that the contractor has delivered all deliverables and returned all government-furnished property; failure to do so may result in this financial action.

What is withholding of final payment?

500

During a site visit, the Government finds that a contractor used an outdated address on a shipping label, but the shipment arrived on time and meets all specifications. In this case, the Government will pursue this action.

Trick! (kinda) What is an Administrative Modification?

500

This post-award term describes materials, equipment, or facilities provided by the government to the contractor for use in fulfilling the contract.

What is government-furnished property (GFP)?