This is the type of approval that you will need when the scope of work includes installing a 4-foot retaining wall, which can be removed in 90 days.
What is a License Agreement?
This engineered document is required by the ROW before any construction or excavation can block a lane, sidewalk, or street in the public right-of-way.
What is a Traffic Control Plan?
An agreement that financially guarantees the principal will fulfill their obligations
What is a Bond?
Attending this meeting is mandatory for excavation over 300 LF.
What is AULCC?
The TGS permit should be linked to this first if it's associated with the project.
What is UC?
This type of official approval from DSD is required before you can install a new residential driveway.
What is a building permit?
This is required when you are combining standard details to be used simultaneously.
What is an engineered TCP?
This document required a $500,000 General Liability.
What is an insurance certificate?
Attending this meeting is mandatory for excavation work related to a long-term project in the Downtown area.
What is DAPCZ?
This is a list of the authorized agents for the ROW contractor.
What is the Members Tab?
This type of approval is needed when the scope of work requires the contractor to bore across the street.
What is Boring Plan and Profile?
Using this, TCP necessitates rerouting pedestrians and placing barricades in the ROW.
What is a sidewalk closure?
It'd be necessary to notarize unless you complete it in front of a ROW employee.
What is the AAF?
This approval is required for utility work exceeding 3000 square feet.
What is a General Permit
All primary or regular excavation permit requests are classified as this.
What is Priority 3?
This approval is required for residential utility connections to municipal water and/or wastewater infrastructure.
What is a Tap Plan?
The document provides the details of the work scope, hours, and duration of the project.
What is the Barricading Summary Table?
The only other permit that requires a ROW license besides DS.
What is EX permit?
This approval is for a large-scale non-residential private site development.
What is a Site Plan?
This group receives a copy of all EX permits.
What is Sitesubpermits@austintexas.gov?
This type of work scope requires the placement to be shown on the erosion and sedimentation plan.
What is a construction entrance?
This is a professional licensed by the State of Texas, who stamps and seals engineered TCPs for complex projects.
What is a Professional Engineer (P.E.)?
The document identifies the individual authorized to sign the bond on behalf of the principal.
What is the Resolution of Authority?
This is approval for a subdivision.
What is a C8?
If a street interrupt is possible on the associated street segment, this field should ALWAYS be a “Yes”.
What is the Comments: Street Interrupt?