Scope
Traffic Control
License
Requirements
Practices/Processes
100

This person approves the installation of a 4-foot retaining wall, which can be removed in 90 days. 

Who is Sam West?

100

This engineered document is required by the ROW before any construction or excavation can block a lane, sidewalk, or street in the public right-of-way.

What is a Traffic Control Plan?

100

An agreement that financially guarantees the principal will fulfill their obligations.

What is a Bond?

100

Attending this meeting is mandatory for excavation over 300 LF.

What is AULCC?

100

The TGS permit should be linked to this first, if it's associated with the project.

What is UC?

200

This type of approval is required before you can install a permanent structure in the ROW. 

What is a License Agreement?

200

This is required when you are combining standard details to be used simultaneously.

What is an engineered TCP?

200

This document required a $500,000 General Liability.

What is an insurance certificate?

200

Attending this meeting is mandatory for excavation work related to a long-term project in the Downtown area.

What is DAPCZ?

200

This is where you can find the list of the authorized agents for the ROW contractor.

What is the Members Tab?

300

This type of approval is needed when the scope of work is minimal but requires the contractor to bore across the street.

What is a Boring Plan and Profile?

300

This TCP Standard allows for a maximum of 660 LF   detour for pedestrians. 

What is a sidewalk closure (804s-1 sheet 4)?

300

It'd be necessary to notarize unless you complete it in front of a ROW employee.

What is the AAF?

300

This approval is required for utility work exceeding 3000 square feet that has not been approved with a Site Plan.

What is a General Permit

300

This review process in the site plan is used to determine if the TCP was reviewed "in-process" or "out-of-process".

What is Traffic Control Review?

400

This approval is required for residential utility connections to municipal water and/or wastewater infrastructure.

What is a Tap Plan?

400

This ETCP requirement provides the details of the work scope, hours, and duration of the project.

What is the Barricading Summary Table?

400

The only other permit that requires a ROW license besides DS.

What is an EX permit?

400

This approval is for a large-scale non-residential private site development.

What is a Site Plan?

400

The contractor must submit their costs and quantities to the designated group.

What is SSI (site-sub inspection group)?

500

This type of work scope requires the placement to be shown on the erosion and sedimentation plan.

What is a construction entrance?

500

This is a pre-approved TCP that is designed by the city and must be sealed by an engineer.

What is a special detail? 

500

The document identifies the individual authorized to sign the bond on behalf of the principal.

What is the Resolution of Authority?

500

This is an approval for a subdivision.

What is a C8?

500

During the extension, if the UC has expired and work has already begun, you need to get confirmation from this appropriate individual.

Who is the DSD Inspector?