Scope
Traffic Control
License
Requirements
Practices/Processes
100

This individual approves the installation of a 4-foot retaining wall, which must be removed within 90 days.

Who is Sam West?

100

This engineered document is required by the ROW before any construction or excavation can block a lane, sidewalk, or street in the public right-of-way.

What is a Traffic Control Plan?

100

An agreement that financially guarantees the principal will fulfill their obligations

What is a Bond?

100

Attending this meeting is mandatory for excavation over 300 LF.

What is AULCC?

100

The TGS permit should be linked to this first if it's associated with the project.

What is UC?

200

This approval is required to cut down or impact a regulated tree on a commercial or multi-family property.

What is a Tree Permit?

200

This is required when you are combining standard details to be used simultaneously.

What is an engineered TCP?

200

This document required a $500,000 General Liability.

What is an insurance certificate?

200

Attending this meeting is mandatory for excavation work related to a long-term project in the Downtown area.

What is DAPCZ?

200

This is where you can find the list of authorized agents of ROW Contractor.

What is the Members Tab?

300

This approval is necessary when the scope of work is minimal and involves the contractor boring across the street, which was not authorized in the site plan.

What is a sealed Boring Plan and Profile?

300

This Traffic Control Plan (TCP) is utilized to divert pedestrians up to a maximum of 660 feet and to place barricades within the right-of-way (ROW).

What is a sidewalk closure (804S-1 sheet 4)?

300

It'd be necessary to notarize unless you complete it in front of a ROW employee.

What is the AAF?

300

This approval is required for utility work exceeding 3,000 square feet that has not been approved as part of the site plan.

What is a General Permit?

300

The review process on an SP is used to determine if the TCP is approved in-process or not.

What is Traffic Control Review?

400

This approval is required for residential utility connections to municipal water and/or wastewater infrastructure.

What is a Tap Plan?

400

This outline details the project scope, hours, and duration.

What is the Barricading Summary Table?

400

The only other permit that requires a ROW license besides DS.

What is an EX permit?

400

This approval is for a large-scale non-residential private site development.

What is a Site Plan?

400

A group to which the contractor submits their cost and quantities.

What is a Site Sub Inspector (SSI)?

500

This type of work scope requires the placement to be shown on the erosion and sedimentation plan.

What is a construction entrance?

500

This document is a TCP designed by a city official and requires a stamp from a P.E.

What is a Special detail? 

500

The document identifies the individual authorized to sign the bond on behalf of the principal.

What is the Resolution of Authority?

500

This is approval for a subdivision.

What is a C8?

500

This individual will authorize the use of the expired UC if work has already commenced.

What is a DSD Inspector?