Irrigation
Irrigation 2
Growzone
Environment
Lighting
100

The "M" page where you can see the overview of all water systems

What is M430?

100

The "I" page where you can change the periods and irrigation settings

What is I400?

100

The area of a single grow out sized table

What is 63sqft?

100

The maximum number of periods in a day

What is 6 periods?

100
The reason we would want to ramp lighting as plants grow

What is conservation of energy when plants are small?

200

The "M" page where all tank levels are displayed

What is M440?

200

The "I" page where you can activate individual valves for irrigation

What is I412?

200

The number of grow out tables we keep in the growzone

What is 980 tables?

200

The amount of time it takes to ramp a single degree in the growzone 

What is 14 minutes?

200

The max number of different lighting recipes that a plant in grow out may experience 

What is 5 recipes or one recipe per stage? 

300
The "M" page where you can see the vialux overview and watch the startup phases

What is M450?

300

The "I" page where you can change the valve group settings

What is I401?
300

The volume of flow we calibrate our valves too

What is 12m3/h

300

The amount of time it takes to ramp 1% of relative humidity

What is 5 minutes?

300

The number of LED lamps that we have over a single stage

What is 8 lights?

400
The "M" page where you can see the irrigation start strategy and its history

What is M400/ M400.2

400

The "I" page where you can set all the water systems to wait or reset them in error

What is I430

400

The maximum number of valves that we can irrigate at one time

What is 4 valves?

400

DAILY DOUBLE*****
Describe the transition from day to night to day again in the growzone.

Day to night will see the light ramping down before the temp and RH begin to transition. When the light has turned off then the temp and RH go to night time settings. Before the lights begin to turn on, the temp and RH begin to increase to day time settings and then lights begin to ramp. 

400

The 4 spectrums that we have in stage 5 and Propagation

What is Red, Blue, FR, and full spectrum/green? 

500

The "M" page where you can view the sump tank EC/pH measurements

What is M405?

500

The "I" page where you can allocate valves to valve groups

What is I401.4

500

The valves that irrigate the transit lanes in both Grow out and Propagation

What is valve 1-5, 51-55, and 601-603

500

The ppm of CO2 that ramps every 3 minutes

What is 100 ppm?

500

The program that we use to edit the lighting recipes

What is Priva Operator?