New Business
Endorsements
Cancellations
Miscellaneous
100

What are the Building Eligibility Requirements per FEMA?

Is affixed to a permanent site

Has two or more outside rigid walls with a fully secured roof

Resists flotation, collapse, and lateral movement; and

Has at least 51 percent of the Actual Cash Value (ACV) of the building,

100

When is the insured signature required for Endorsements?

Decreasing BLDG / Contents coverage

Increasing BLDG / Contents deductible

Policy Assignment (Insurer Assumption)

AOR Changes

100

Previous agent requests the Settlement statement from the AOR to process this type of Cancellation.

Cancel 01 - Building Sold, Removed or Destroyed.

100

Give an example of good comments for a refund to the insured after a CX01 with no forwarding address.

RPC $129 Reason 62 o/o (Sent to AOR - no forwarding address listed.)

200
Can we add the Floodproofing discount to a New Business policy?

You will mark the Elev screen with Y—Possible Floodproofed. and send packet to FEMA- NFIPCustomerService@fema.dhs.gov

200

Name all the reasons for a CX/RW.

Incorrect P/A

Incorrect Eff Date

Incorrect subline

Non-Chronological

System Constraints (i.e. provisional to tool)

200

Renewal eff date 9/20/26 - paid in full. Agent submits a dec page from Farmers with eff date of 9/20/26. Insured calls in stating they want to cancel Wright and they are leaving their current agent for Farmers. What must be done.

Dup policies with same Eff date - insured can pick which one to keep. Need a signed statement from Insured. Moving to Farmers would automatically change their AOR so no further action required.

200

Paid closed claim on active term and the AOR submits a cancel request along with the dec page from Farmers with the eff date of 9/15/26. Can Patty cancel this policy as a duplicate?

No for two reasons - First the duplicate policy is Farmers with a later eff date. Second the policy cannot be cancelled on this term due to the paid claim.
300

Name each Diagram # along with their corresponding type.

Dia1 - Slab on Grade

Dia1B - Slab on Grade - Stem Wall

Dia2A - Basement

Dia2B - Basement with access

Dia3 - Split Level 

Dia4 - Split Level - Basement below grade.

Dia5 - Elevated with Posts, piles, piers

Dia6 - Elevated with Enclosures

Dia7 - Elevated w/o posts, piles, piers 

Dia8 - Crawlspace

Dia9 - Subgrade Crawlspace

300

I want to remove contents coverage midterm. Am I allowed to?

Must provide statement advising why and event date. 
300

Erin completes a CX/RW to change the P/A. In doing so there is an AP of $322.00 owed to issue the new policy. Erin sends the corr letter 3 times to the Agent, Lender, and Insured. What CX reason can Erin use.

Cancel 30 - Insufficient Premium to Retain Coverage

300

Insured speaks to Stevn and complains that their current AOR never returns calls or emails. The insured is over it and wants to keep their current policy because of great CX service. What does Stevn do?

1- Ask why

2- Collect Info

3 - Forward to sup

4- Advise insured about callback

5 - Comment policy

400

Why would you need to convert the Datum?

If the EC was written with the NGVD 1929 data it must be converted to NAVD 88 to enter into the tool.

400

How often does an RCV need to be received. 

Every 3 years to properly rate. Cannot issue renewal or EN without updated info.

400

Agent requests cancel because the insured did not pay them. The request form has just the agent signature with an eff date next week. What is wrong?

This is not a valid request from the agent. We would send a corr letter explaining that per the manual Reason Code 05 is not valid if an agent advances insurance agency funds without first receiving payment from the policyholder. 

400

Starr is working the EN queue and comes across Morton Plant Hospital requesting Floodproofing. They seem to have all the documents. Starr is eager to improve her production numbers and re-rates as Y to floodproofing.

Starr cannot handle this request. Only those who are authorized to work Floodproofing can handle the request.
500

A building built in 1950 sitting on the river Styx sitting on posts. FFH is 8.  What diagram is this?

Diagram 6 (Elevated with Enclosure)

Use the enclosure floor to determine the FFH measurement when the building is Pre-FIRM any zone or Post-FIRM in zones B, C, X, D, Unnumbered A, A99, AO, AR/AO, or Unnumbered V

500

EN on 8/15/26 to above Option B. Greater than 90 days from renewal. Eff date of 11/14/26. Payment received on 8/26/26. 

Day 1- Increase to Option B.

Day 2- Effective 30 days from when we received the payment for above option B limits.  

500

Policy taken over by Wright mid-term. During insured call, Karla notices the building has no walls but has 3 years of prior terms. What does Karla have to do?

This building is not eligible for issuance. Karla would process a CX06 after speaking to the AOR for documentation.

500

Stephanie is asked to help in the queue. She receives a request from the insured to remove Wells Fargo. There is a closed claim on the previous term.  

Stephanie will advise the insured that she will forward to the back office for disposition. She will then email Claims and they will handle it.