Process
Gate Reviews
Sales
PM1 Rev 3
Mystery
100

This date field is set during this gate and is when we deploy to the customer for acceptance/validation.

What is Due Date and G1?

100

This ticket and RFRB statuses are used for G0 agenda respectively

What is Open and Owner & CCB

100

This team is assignee for the quote and invoice tickets

What is Sales

100

Blockers are created in this part of the Epic under their respective projects.

What is Issues in epic

100

These two fields are required when the resolution is Fixed on an Epic

What is Software Change and Configuration change

200

The PM selects this field after quote acceptance for Epics blocked by Quote

What is RFRB to Planning

200

This team’s blocker requirements may not be known at G0 or G1 and may need a ROM effort for G1 quote estimates.

What is ITOPS or SysOps/DbOps

200

This state is used when a quote is sent

What is Resolved

200

An Epic without blockers requires this prior to Execution (i.e. a PM only task)

What is G1 approval?

200

These 6 are the components used for blockers

What are AD_SWE, AD_PERF, AD_WB, AD_SysOps, AD_DbOps, AD_ADS

300

This required field describes what was completed as part of resolving a ticket

What is Implemented Solution

300

These 4 things should be captured in the description of a quote ticket prior to moving the Epic to G1.

What are description of deliverable/service, an email address to send the quote to, a breakdown of the approved estimates and billable amount, and context of schedule (if applicable).

300

These two fields should be completed on the Epic when a customer accepts a quote and is invoiced respectively.

What is Quote Accepted and Invoice Sent

300

This person is responsible for moving a validated ticket to VERIFIED ON DEV

What is Peer Reviewer

300

The Verified on Test and Q/A software states represent what

What is Ready for Programs QA and Ready for Deployment

400

These 4 fields must be complete when resolving a a bug ticket

What is Resolution, Implemented Solution, Config Change, Software Change

400

These two things represent when a Quote and Invoice task are approved to be worked (i.e. Open sales tickets)

What is G1 approval for quote and Production Deployment 

400

This quote ticket status is used when a quote is accepted and the PM should set RFRB to this.

What is Verified Resolved and Planning

400

For any change of the Epics Planned End, Due, and OEM need date after G1, this comment should be added by or tagged with Gate Approvers and affected TLs

What is OTD - dates(s) was/is statement and provide a reason for the change (e.g. customer changed, SW errors..., PM delayed testing) 

400

These 4 metric label types are added at G2

What is SLA, OTD, FTQ, Revenue Generator

500

Only the Gate Approvers are allowed to change RFRB to these 3 states unless otherwise specified

What is Scoping, Execution, and Quote

500

A PM is done with a project when the Epic is in this status, RFRB is in this state, and blockers are in this status.

What is Verified Resolved, Closure, and Closed

500

These two labels are required in the Sales invoice ticket to VR and move the RFRB to Closure

What is Invoice # and Month labels

500

The PM must do this action with this specific context in the Epic when an issue is found after deployment to customer test environment

What is Comment with FTQ - <description of the issue and team accountable>

500

This field will be added in the near-term to link changes

What is Fix Versions