Project Fundamentals
Safety
Estimating
Procurment
Field Leadership
100

The 10-week Haskell program designed to introduce interns to project management fundamentals in the AEC industry.

What is Project Foundations?

100

Injuries on jobsites create costs directly and indirectly. Direct costs include medical care, fines, claims, and equipment damage. Indirect cost include brand damage, retraining, loss of morale, and this.

What are schedule delays?

100

The process of measuring and calculating the quantities of materials, labor, and equipment needed for a construction project.

What is a quantity takeoff (QTO)?

100

It is important that the contractors we work with can complete the work. The process of evaluating subcontractors before awarding work.

What is vendor qualification?

100

These are the two roles that share the most important internal partnership in field leadership?

Who are the Project Manager & Superintendent?

200

Haskell's industry, usually displayed as the acronym AEC.

What is Architecture, Engineering, Construction?

200

An visual tool to identify and control sources of hazards on a jobsite, it contains sections including temperature, gravity, motion, mechanical, electrical, pressure, sound, radiation, biological and chemical.

What is an energy wheel?

200

This is an entry-level position within preconstruction for college graduates.

What is Preconstruction Specialist?

200

An item of required work that isn’t captured in any contractor’s scope of work — and consequently isn’t assigned to anyone.

What is a scope gap?

200

A key skill needed for field leadership roles along with staying calm under pressure, remaining organized, and clear communication.  

Accept any:
What is teamwork?
What is problem-solving?
What is leading by example?  

300

These four Haskell values drive our decisions in operations and our relationships.

What are Team, Excellence, Service, Trust?

300

A U.S. government agency that sets and enforces standards to ensure safe and healthy working conditions, known by the four letter acronym, OSHA.

What is Occupational Safety and Health Administration?

300

Haskell quantity takeoffs utilize tools like On Center, Bluebeam, and this one - which allows users to measure quantities and link them to cost data.

What is  Planswift?

300

These are the four main steps of Haskell procurement.

What are Prep, Pricing, Scoping, Award?

300

Field leaders responsibilities span the entire project, including during preconstruction with constructability reviews and this.

What are site logistics?

400

The Design-Build Project Delivery Method has a single contract with a team responsible for both design and construction, streamlining delivery; whereas, in this project delivery method the owner contracts separately with designer and CM, the CM advises during design, and then builds, with a guaranteed max price.

What is Construction Management at Risk (CMAR)?

400

The fifth hierarchy of a fall that should not be the first line of defense. Along with hazard elimination, passive protection, fall restraint and fall arrest, it contributes to jobsite safety.

What are administrative controls? (training & signage)

400

This document identifies a group of prequalified contractors who will be invited to price a particular scope of work on a project.

What is a bid list?

400

In a contract this is the place from where the inclusions are derived?

What is a Scope of Work?

400

This important process of reviewing plans during preconstruction ensures buildability, catches issues early, and improves project outcomes.

What is a constructability review?

500

After a tangible project opportunity is identified, the request is evaluated and strategy is used to prepare a response during this phase of the project lifecycle.  

What is the proposal phase?

500

Soil falls at different rates depending on the height from which it falls. From this height, soil will fall in .61 seconds…. Still think you can outrun it!?

 What is 6 feet?

500

The process which brings designers, engineers and construction management together to analyze every step of a project to ensure maximum value.

What is value engineering?

500

The number of coverages that are held by Haskell and required of our subcontract partners?

What is 9?

General liability, Umbrella & Excess liability, Professional & Pollution, Marin Cargo, Foreign DIC & Other Ancillary Policies, Builder's Risk Insurance, Subcontractor Default Insurance, Worker's Compensation, Auto Insurance

500

This role maintains safety and quality on a job site by doing site walks, enforcing PPE, having daily huddles, and monitoring work for quality.

Who is the superintendent?