DM Challenges/Best Practices
IGT/Hybrid OR’s/Schneider Program
MRI/Turnkey/PROS
Escalation & Who's Who
DXR/PET CT
100
Customer request (RDD) not backed by a real construction plan but rather by the dreams and desires of Sales and hospital staff are considered this.
What is "one of the many date management decisions/challenges the PM's face"?
100
"2"
What is "how many VWCB’s come on the back of the MCS when a Flexvision 10 or 11 Input Package is selected"?
100
5 day LEAD TIME which is different from prior process.
What is "the first visit from KKT to commission a chiller"?
100
Your "Order Management Specialist" and cc: Dave or Chett.
What is "the first level of escalation when you need your CDD improved"?
100
41.25”
What is the minimum doorway clear opening for Combi-Diagnost?
200
Projects can last for weeks, months, or even years from order booking until production start, so checking a configuration prior to this event is highly recommended
What is "what you should do before the Freeze / Z4OK"?
200
They are now combined in ONE feed in a split screen format
What is "unique about the live and reference images on the Azurion system compared to Allura"?
200
The company that is in partnership with Philips and sells the “Unify” MR-LINAC product.
Who is Elekta?
200
DEFOA
What is "the process used by the FSE to order missing, wrong or defective parts during an installation"?
200
1/8” over the length of the plate.
What is "the floor levelness requirement for the Combi-Diagnost floor plate"?
300
ZID Forecast & Sr. Leadership Forecast
Who/what are the most impacted when dates are changed anytime during the complete project cycle?
300
XL Video Slaving
What is "the option on both Allura and Azurion systems that allows the customer to view exactly what is displayed on the main Flexvision screen onto a 2nd large screen monitor in the exam room"?
300
It was noted this is the first time the MRI BIU has done this.
What is "reduced requirements for the Helium Vent Pipe".
300
Mike Miller (Bothel)
Who is "our support person to assist in Logistics issues".
300
5 weeks
What is "the lead time for Gammex Laser floor mounted laser posts"?
400
Should be completed within 72 hours of receipt of your CDD.
What is "when should you enter your SID & FSRD"?
400
Request for Modification process
Your customer wants to be able to put our operator controls on a rail on the boom when they are not in use table side. What is "the process called to seek approval of a proposed solution from the factory"?
400
The upcoming new software architecture that is required by “MR-RT for Ingenia” and the reason its release is waiting for MR software R3.5.1.
What is the “Plug-In” architecture (for support of the MR-RTgo plug-in)?
400
If project is not moving forward and your Account Manager is not really helping.
What is "escalate" to your manager.
400
Does not need to be shipped back. Just need to notify Gammex and can be corrected in the field.
What is "if the wrong color of Gammex Lasers arrive on site, do they need to be shipped back to Gammex and replacement laser sent to the customer site?
500
Enter an estimated FSRD.
What you do if your RDD >120 days and not confident of your RDD, but have some idea when the project may happen?
500
2 diagnostic quality DVI signals, one 1080p HD signal for the Video Integrator.
What is "the 3 outputs of the XL Video Slaving options"?
500
A wall-mounted 480/3 phase (US) circuit breaker box, that get its power at least one distribution panel upstream of the hosting MR scanner’s power source.
What is "where does a HIFU Generator Cabinet get its power"?
500
Efficient way to update Clarity information, complete a DQ, check on c/o's, get you an MDIR.
What are some of the items the PM Support Team will do for you: Call 1-978-659-7700?
500
(1) The computers cannot be split apart and placed in different rooms. (2) The top of the computer cabinet cannot be removed.
What are the (2) changes to the Big Bore Control computer, which are part of the BBCT upgrade from V3.6 to V4.2?