3.00 Vocabulary
4.00 Vocabulary
3.00 Methods
4.00 Methods
100

Scope baseline is

The approved version of a scope statement, work breakdown structure (WBS), and its associated WBS dictionary, a component of the project management plan. Components of the scope baseline include Project Scope Statement, WBS and WBS Dictionary.

100

Activity list is 

A comprehensive list including all schedule activities required on the project.  The activity list includes the activity identifier and a scope of work description for each activity in sufficient detail to ensure that project team members understand what work is required to be completed.

100

WBS stands for

Work Breakdown Structure

100

Work Breakdown and Sequence are basically 

step-by-step directions on how to complete a activity

200

WBS Dictionary is

Document generated by the Create WBS process that supports the WBS. The WBS Dictionary provides more detailed descriptions of the components in the WBS.

200

Project management software is

Used to help plan, organize, and manage resource pools and develop resource elements

200

One benefit of WBS is 

any of these: 

It shows everything you
have to do in a project.
It can be used to help make
a scope.
It can act as the schedule for
how long each job should
take 

200

one website that helps with Analyzing Project Management is

any of these

Monday.com

Wrike

ClickUp

300

Accepted Deliverables is

Deliverables that meet the acceptance criteria are formally signed off and approved by the customer or sponsor. Formal documentation received from the customer or sponsor acknowledging formal stakeholder acceptance of the project’s deliverables.

300

Parametric estimating is

Parametric estimating is a statistical and accuracy-based technique for calculating the time, cost, and resources needed for project success. Combining historical and statistical data, parametric estimating uses the relationship between variables to deliver accurate estimations.

300

WBS is important because

it will help organize and structure all the work that needs to be done.

300

What if analysis is used when

all the activities you want to do add up to over your given deadline 

400

Variance Analysis is

Project performance measurements are used to assess the magnitude of variation from the original scope baseline.

400

Critical Path Method is

The critical path method (CPM) is a technique where you identify tasks that are necessary for project completion and determine scheduling flexibilities. A critical path in project management is the longest sequence of activities that must be finished on time in order for the entire project to be complete.

400

the method verify scope is

the process of comparing the actual deliverables against what was documented within the scope baseline.

400

Critical path method is used when

you need to find the fastest time to complete all activities in a project

500

Work Performance Measurements is

Measurements can include planned vs. actual technical performance or other scope performance measurements. This information is documented and communicated to stakeholders.

500

Schedule Compression is

Schedule compression is a technique used in project management to shorten an already-developed schedule. This might be done to meet an updated delivery date, a new opportunity, or a schedule delay. It's done without changing the scope of the program.

500

The method control scope is

the process of monitoring the status of the project and product scope and managing changes to the scope baseline.

500

you use project crashing when

you are behind schedule for some reason so you use extra resources to speed up the process of the activites