Change Management
Integration
The Charter
Teamwork
Coaching
100
Unplanned changes to a project that rack up costs and take up time are referred to as?
What is scope creep
100
What document should specify the formal change management process?
What is the contract
100
The last element every charter must have.
What is the signature
100
When a team is all geographically in the same area we refer to the team as this.
What is co-located
100
A highly knowledgeable but poorly motivated employee can ultimately result in what kind of an employee?
What is bored.
200
Poor change control typically results from?
What is scope creep
200
What type of changes require a formal change order?
What is all
200
The charter exists primarily to give what to the project manager?
What is authority
200
When the team is not all geographically located in the same area we refer to the team as being...
What is virtual
200
During the coaching session, what should the project manager do with his observations?
What is communicate
300
A change that is still be considered is referred to as this
What is contemplated
300
Once a change order is approved, it becomes a part of this...
What is the master plan
300
How many mandatory elements are there to make a proper charter?
What is six
300
What is the key factor in building high performing teams?
What is trust?
300
Rewards and recognition are both best done in what kind of a setting?
What is private
400
Technological uncertainty is one of these
What is a cause of change
400
If the solution for a change being analyzed is actually still within the scope, what kind of a document is issued?
What is an instruction
400
The charter is written during what phase of the project?
What is initiating
400
What type of costs can virtual teams enjoy?
What are lower costs
400
Your teammates tend to have a low level of knowledge and a poor level of motivation in which of the four quadrants in their natural progression?
What is the second
500
Who is always consulted during a formal change?
Who is the project manager
500
if the solution to a change being analyzed is essential, this document is issued...
What is a change directive
500
Another name for the charter is?
What is the statement of work
500
The communication management style for virtual teams needs to change from accidental to?
What is purposeful
500
Knowledge, motivation, and these are the three elements of a project team worker's development that a project manager must at all times manage...
What are expectations