True or False in Problem Analysis
No "WHO" because we don't look for someone to blame
TRUE
It is the conversion of donut to P10 Shell using weight as basis.
Donutization
Whammos/Fat Fingers is in what company?
Amarela
The commercial activity of transporting goods to customers.
LOGISTICS / DELIVERY
What is POD's MISSION?
Note: The whole group must recite.
We CONSISTENTLY provide the best experience to our customers by producing QUALITY PRODUCTS and DELIVERING GREAT SERVICE, EFFICIENTLY and EFFECTIVELY.
The first step in problem analysis.
IDENTIFY THE PROBLEM
Formula for Donutization
Absolute Volume x Donutization Factor
Adjustment of orders is allowed on/or before _____ days before pick-up date.
2 days.
Battery, Lights, Oil, Water, Brakes, Air, Gas, Engine, Tools, Self
True or False. If you are a PS1, Delivery Management is part of your KPI in POD's BSC.
FALSE.
PROBLEM ANALYSIS
What is the conversion factor of a YR P10 Shell?
1.56 pc
What is the code for creating an ICPO?
ME21N
The period between a start and end time in which a network location, such as a stop in a route analysis should be visited by a route.
Window Time
It is a product's price minus all associated variable costs, resulting in the incremental profit earned for each unit sold.
Contribution Margin
1. Shotgun
2. Trial and Error
3. Shoot from the hip
1 - (Actual vs Standard / Standard)
What code will you use to upload a Sales Order?
ZT1SO_UPLOAD, VA01
If battery cost P4,250, and is rated to last for 18 months, how much will the daily amortization be for the battery for your fixed cost?
1. PQL
2. MTL
3. ITL
4. Utility
What are the 4Ms that you need to consider when analyzing Distinctions of the IS?
MAN
MACHINE
METHOD
MATERIAL
Required Hours is 24 which is equal to 3 HC-FTE. Actual HC is 2 with 4 OT each.
Given: Rate per Hour Php 83.41
What is the difference of equal vs actual?
Php 167
What is the DOC HEADER TEXT for Goods Movement of FG and RM Consumption (part of BOM)?
1st DEL_MMDDYY (DEL DATE)
If the 2nd shop is 30km away from the plant, what is the assigned window time for the 2nd drop in the route?
–Cruising speed 40km
–Service time is 5min/shop
- Time from 1st shop is 4AM
4:50 - 4:55AM
Compute for Plant Route CM % and Peso:
• Net Sales: 10,000
• Delivery Cost: 800
• Variable Cost: 52.50%
Plant Route CM% =100%-52.5%-8% = 39.5%
Plant Route CM Peso = 39.5% * 10,000 = P3,950