What is What is Not
Hart & Joed
Baon sa Utang
Lala Move
Madali lang 'to Promise
100

True or False in Problem Analysis

No "WHO" because we don't look for someone to blame

TRUE

100

It is the conversion of donut to P10 Shell using weight as basis.

Donutization

100

Whammos/Fat Fingers is in what company? 

Amarela

100

The commercial activity of transporting goods to customers.

LOGISTICS / DELIVERY

100

What is POD's MISSION? 

Note: The whole group must recite.

We CONSISTENTLY provide the best experience to our customers by producing QUALITY PRODUCTS and DELIVERING GREAT SERVICE, EFFICIENTLY and EFFECTIVELY.

200

The first step in problem analysis.

IDENTIFY THE PROBLEM

200

Formula for Donutization

Absolute Volume x Donutization Factor 

200

Adjustment of orders is allowed on/or before _____ days before pick-up date.

2 days.

200
What is the meaning of BLOWBAGETS? 

Battery, Lights, Oil, Water, Brakes, Air, Gas, Engine, Tools, Self

200

True or False. If you are a PS1, Delivery Management is part of your KPI in POD's BSC.

FALSE.

300
It is a systematic process for identifying the true cause of the problem.

PROBLEM ANALYSIS

300

What is the conversion factor of a YR P10 Shell?

1.56 pc

300

What is the code for creating an ICPO? 

ME21N

300

The period between a start and end time in which a network location, such as a stop in a route analysis should be visited by a route. 

Window Time

300

It is a product's price minus all associated variable costs, resulting in the incremental profit earned for each unit sold.

Contribution Margin

400
Name at least 1 Problem Solving Styles to avoid

1. Shotgun

2. Trial and Error

3. Shoot from the hip

400
What is the formula to compute Efficiency? 

1 - (Actual vs Standard / Standard)

400

What code will you use to upload a Sales Order?

ZT1SO_UPLOAD, VA01

400

If battery cost P4,250, and is rated to last for 18 months, how much will the daily amortization be for the battery for your fixed cost?

Php 7.87
400
Name at least 2 stations or positions in the Non-Produced category.

1. PQL

2. MTL

3. ITL

4. Utility


500

What are the 4Ms that you need to consider when analyzing Distinctions of the IS? 

MAN

MACHINE

METHOD

MATERIAL

500

Required Hours is 24 which is equal to 3 HC-FTE. Actual HC is 2 with 4 OT each. 

Given: Rate per Hour Php 83.41

What is the difference of equal vs actual? 

Php 167

500

What is the DOC HEADER TEXT for Goods Movement of FG and RM Consumption (part of BOM)? 

1st DEL_MMDDYY (DEL DATE)

500

If the 2nd shop is 30km away from the plant, what is the assigned window time for the 2nd drop in the route?

–Cruising speed 40km

–Service time is 5min/shop

- Time from 1st shop is 4AM

4:50 - 4:55AM

500

Compute for Plant Route CM % and Peso:

• Net Sales: 10,000

• Delivery Cost: 800

• Variable Cost: 52.50%

Plant Route CM% =100%-52.5%-8% = 39.5%

Plant Route CM Peso = 39.5% * 10,000 = P3,950