A6 cut gloves
How far upstream and downstream should we lock out when working on conveyance?
6 feet
What is the first step in the LOTO process?
Prepare:Review placard, wear PPE, and complete PTP:identify all hazardous energy sources
What must be done before operating a MEWP?
PTP and pre-use inspection
Where should a PTP be done at?
At the job location before work starts.
What should you do if your daily base layer uniform is damaged or has holes? (3 answers)
1) Stop wearing the damaged PPE
2)Escalate to your manager
3) Order new PPE
What color tape do we use to block off our work area to keep us and associates safe?
Red danger tape.
What is required to be on your LOTO tags?
Name, Picture, Amazon Alias
When should Fall Protection be inspected?
Before each use
What is the term for the scope of a job changing and a new PTP needing to be done?
Task Creep
What is the minimum incident energy your daily base layer shirt must protect against? (answer is in Cal/cm^2)
4.6 Cal/cm^2
What should we use if we find a job to be unsafe even after a PTP is done?
Stop Work Responsibility
When is LOTO not required when the equipment is powered by Cord and Plug?
When only one person is working and they can maintain exclusive control of the cord and plug (IE in arms reach)
How far must the red tape be from a MEWP when working at heights?
20 feet radius
When is a PTP required to be completed?
Before any work is started or if the job changes beyond the scope of the original PTP
When are gloves NOT to be worn while doing work?
When using rotating tools such as drills, saws, grinders, etc...
what is the weight limit an RME tech can lift before a team lift is REQUIRED?
50 lbs
What should you do if your shift is about to end and you have a red personal lock on a piece of equipment that is still needing to be worked on?
Reach out to your manager and get a BLUE shop lock for the equipment.
How close can you get to an overhead fan before the fan has be locked out while on a MEWP?
10 feet
If APM is not working and a PTP can not be done online what must you do?
complete a paper PTP and upload a picture of it to the work order.
List 8 PPE items we use as RME
FR shirt, FR pants, FR over shirt, Safety glasses, Bump cap, Hard hat, Ear plugs, A6 cut gloves, Rubber/leather electrical gloves, Electrical rated Composite toe safety boots, Electrical rated hard hat, Electrical rated face shield, Balaclava, Fall protection harness and lanyard, Safety vest
when we find safety hazards before an accident or near miss happens what do we do?
We escalate to our managers and fill out a Good Catch Form and work to remedy the situation.
What should you do after Locking Out a pneumatic system?
Bleed the air in the system to ensure a zero energy state.
When are A-frame ladders not to be used?
When 3 points of contact can not be maintained.
When can a Take 2 be used on a PTP?
For any low risk tasks.