Power Generation Fleet
Environmental
100

The number of years since PWGS's last DART injury.

What is 4 years?

100

The height of the stacks.

What is 210 feet?

100

The block that was constructed first during the conversion to gas.

What is Block 2?

100

The percentage of ATC owned by WEC Energy Group.

What is 60%?

100

The regular inspection frequency for the environmental cover system.

What is annually?

200

The year of PWGS last lost time injury.

What is 2011?

200

The temperature the 20ST Reheat Turbine Inlet Temperature must be above to constitute a "hot start".

What is 500 oF?

200

The output of the coal plant.

What is 400 MW?

200

The generating capacity of WEC Energy Group assets to the nearest GW.

What is 8 GW? (Specifically 8.150 GW)

200

The percent opacity for visible emissions allowed by the air permit.

What is 20%

300

The height of a potential fall for which wall openings must be guarded.

What is four feet or more?

300

The rated steam turbine output.

What is 265 MW?

300

The year Block 1 went into commercial operation.

What is 2008?

300

The year that coal will be eliminated as an energy source for WEC Energy Group.

What is 2032?

300

The maximum design intake velocity required to comply with impingement mortality standards.

What is 0.5 feet per second?

400

The number of employees who can be attached to a vertical lifeline for appropriate fall protection.

What is one?

400

The two cycles which make a plant "combined cycle".

What are the Brayton and the Rankine Cycles?

400

The increase in the output for the plant following the conversion from coal to gas in orders of magnitude (i.e. 1X, 2X, 3X, etc.).

What is 3 orders of magnitude?

400

The potential max load required in GW by the Vantage Data Center in Port Washington.

What is 3.5 GW?

400

The maximum concentration in ppm of CO at 15% O2 for a 24-hour rolling average per the air permit.

What is 3.0 ppm?

500

The incident energy, in cal/cm2, at which arc rated clothing is required?

What is 2 cal/cm2?

500

If not maintained above this point, the gas turbine load at which duct burners will shutdown.

What is 90% of base load?

500

The year the plant was designated a National Historic Mechanical Engineering Landmark.

What is 1980?

500

The expected increase to the nearest GW of projected added electric demand from 2026-2030

What is 3 GW? (Exact answer is 3.4 GW)

500

The total NOx emissions in tons which may not be exceeded in any 12 consecutive month period.

What is 318.0 tons?