Safety
Operation
Data Centers and Other Growth
Power Generation Fleet
Environmental
100

The number of years without a Lost Time injury.

What is 15 years?

100

The two cycles which make a plant "combined cycle".

What are the Brayton and the Rankine Cycles?

100

What renewable (solar, battery storage, or wind) is the leading investment, in terms of MW, through 2026-2030.

What is Solar?

Solar: 3,850 MW

Battery Storage: 2,130 MW

Wind: 555 MW

100

The percentage of ATC owned by WEC Energy Group.

What is 60%?

100

The meaning of LITE PM.

What is Licensing, Inspection, Testing and Environmental.

200

Per the safety plan, the percentage of JSSO's that should include observation of the pre job briefing.

What is 60%?

200

The temperature the 20ST Reheat Turbine Inlet Temperature must be above to constitute a "hot start".

What is 500 oF?

200

The project cost for the -200 upgrade.

What is $227 million?

200

The generating capacity of WEC Energy Group assets to the nearest GW.

What is 8 GW? (Specifically 8.150 GW)

200

The percent opacity for visible emissions allowed by the air permit.

What is 20%

300

The height of a potential fall for which wall openings must be guarded.

What is four feet or more?

300

The rated steam turbine output.

What is 265 MW?

300

The end users of the Vantage Data Center in Port Washington.

What are OpenAI and Oracle?

300

Per the last investor slide deck, the expected retirement dates for Oak Creek Units 7-8.

What is "targeting end of 2027*"?


*The decision to keep the Oak Creek units available will better position us to serve customers with safe, reliable and affordable energy on the hottest and coldest days of the year. The extension of the Oak Creek units will serve as a bridge until new dispatchable generation begins coming online, which is expected in late 2027.

300

The maximum design intake velocity required to comply with impingement mortality standards.

What is 0.5 feet per second?

400

The number of employees who can be attached to a vertical lifeline for appropriate fall protection.

What is one?

400

The name of the film forming chemical that will be used in the HRSGs.

What is anodamine?

400

The PSCW approved subscription to protect ratepayers from large demand customers requiring new generation.

What is the Very Large Customer Tariff?

400

The expected increase to the nearest GW of projected added electric demand from 2026-2030

What is 3.9 GW? (answer was 3.4 GW the last time we played this game!)

400

The year coal will only be used as a backup fuel.

What is 2030?

500

The incident energy, in cal/cm2, at which arc rated clothing is required?

What is 2 cal/cm2?

500

The Power the Future lease term expiration dates for Block 1 and Block 2.

What are May 2033 for Block 1 and July 2030 for Block 2?

500

The current forecasted demand for the Vantage Data Center. Bonus points for site potential demand.

What are 1.3 GW and 3.5 GW?

500

The number of retail customers for WEC Energy Group

What is 4.8 million?

500

The year coal will be eliminated as an energy source

What is 2032?