Concrete Basics
Welding
Adverse Weather Concrete
Material Receiving
Potpourri
100

A component of concrete along-side of water, admixtures, and cementitious material.

What is aggregate?

100

This is what must be sought out in order to produce sound, quality welds prior to start of production.

What is a Weld Procedure Specification (WPS)?

100

The first step to combat adverse weather effects on concrete.

What is proper planning?

100

This person is responsible for performing the Material Receiving Inspection.

Who is the Field Handler in Charge or someone designated by the Discipline Lead?

100

The document that identifies required inspections and tests for a material/work scope.

What is the Inspection & Test Plan?

200

This concrete test helps measure workability, not water-cement ratio.

What is slump?

200

This inspection method is required on 100% of all welds.

What is Visual Inspection (VT)?

200

The design document that governs the highest temperature mass concrete can be deposited for a given placement.

What is a Mass Concrete Plan or a Thermal Control Plan?

200

The team you discuss receiving requirements with regarding incoming deliveries.

Who is the Logistics Team (P381.Logistics@381constructors.com)?

200

This aggregate laboratory test gives a particle size distribution of the material.

What is a gradation test?

300

This function must be performed to guarantee homogenous concrete within a multiple-lift placement.

What is vibration/vibrating?

300

With regards to Safety, this person is required to be on stand-by during welding and stay around after welding is complete.

Who is the fire watch?

300

Per ACI 305.1, this is the maximum allowed concrete placement temperature.

What is 95 degrees F?

300

This is what needs to be done to material received without material certs to ensure it's not installed.

What is Quarantine?

300

This is the ONLY WAY to properly modify project specifications and/or plans after being issued for construction.

What is a Request for Information (RFI)?

400

This defect phenomena occurs when the concrete surface dries faster than the layer underneath.

What is spider cracking?

400

This welding method (full term) is commonly referred to as "stick".

What is Shielded Metal Arc Welding?

400

At a minimum, this method is ideal for protection during cold weather concreting.

What is blanketing?

400

The time period to perform a Material Receiving Inspection.

What is "when the material arrives"?

400

This Quality Team member famously and repeatedly says he "does nothing".

Who is Frank McDewell?

500

This is the primary additive to utilize hydration control of concrete for P-381.

What is DELVO?

500

This advanced non-destructive test is not allowed on shipyard property.

What is radiographic testing?

500

This adverse weather condition is "not only limited" to a certain time of the year, even though the name specifies as such.

What is Hot Weather Concrete?

500

The document to be completed for deliveries AND the location to submit the document and supporting paperwork.

What if the Material Receiving Report (MRR) and where is InEight Completions Web?

500

The quote of Quality Week 2025.

What is "Done Right. Done With Pride".