General Plant
Buckets
Tanks and Samples
Inspections
Documentation
100

This Device keeps hair on your head from contaminating material

Hair Net

100

This color bucket is used for tools

Grey

100

Minimum oil temperature in which to transfer titer

170 degrees

100

How many seals are used to properly seal a truck?

3

100

The act of filling out documentation with zero verification steps

Falsifying Documents

200

This device keeps hair from your face contaminating oil

beard net

200

This color of bucket is used for sanitation (degreaser, sanitizer, bleach and soap)

White Bucket

200

Size of a Final Oil Analysis Sample

32 ounces

200

How many seals are used to properly seal a railcar?

3

200

Documentation Corrections require:

single line through information, initial and dated

300

What is the longest you are allowed to wear finger nails in the plant

quarter inch

300

This color bucket is used for liquids containing hexane

Red Bucket

300

This gas is used to preserve shelf life and mitigate PV within a vessel

Nitrogen Gas

300

When should seals be assigned to a vessel

When the railcar is assigned
300

What does ISO stand for? 

International Organization for Standardization

400

What is the only ring you are allowed to wear in the plant

wedding band

400

This color of bucket is used for waste materials

green bucket

400

This tank provides the hot water and condensate to all tanks to keep them hot within the refiner. Hint: We also use it as a water source for high pressure washing

Condensate Tank

400

What is the purpose of a Seal

Ensure contents are not tampered with

400

This document is used for Pre-Start Up to ensure all quality risks are identified and corrected prior to sealing up a vessel or starting a process

PSSR: Pre Startup Safety Review

500
this containment is used for broken glass

 carboard box

500

This color of bucket is used for material that is intended to be added back to the process

Yellow

500

This gas is used to clear lines of potential contamination

Nitrogen Gas

500

This inspection step is used to ensure the vessel is loaded with quality product, properly sealed and documentation is accurate

Post Load Inspection

500

Required to be filled out when any change is implemented

Management of Change (MOC)