PI
CI
Standardization
BIQ
SLT
100

Meaning of the acronym PI

What is People Involvement?

100

Meaning of the acronym CI

What is Continuous improvement?

100

Where the main elements of an operation are found

What is a Standard Task Sheet?

100

Meaning of the acronym BIQ

What is Built In Quality?

100

Meaning of the acronym SLT

What is Short Lead Time?

200

Driving EVolution on the AVenue of engagement

What is the plant vision/mission statement?

200

How we run the business

What is Business Plan Deployment?

200

Term used to identify total amount of time to completed standardize work

What is Actual Takt Time?

200

The process followed when an error proofing action has been off for an extended period of time

What is the Bypass Reaction Plan?

200

The policy in which a single piece of material flows

What is First In, First Out?

300

The process of how we train production operators

What is Job Instruction Training?

300

Process when you have a repeat defect multiple times

What is Practical Problem Solving?

300

One of the five principles of visual management, this one requires clear visuals in the policy of regular audits, tours, and monitoring requirements.

What is Sustain?

300

Fastener needing a secondary check?

What is a PS1, Critical Fastener, KPI?

300

Correction, Overproduction, Motion, Material Movement, Waiting, Inventory, Processing

What are the forms of waste?

400

The most preferred step in reducing a hazard

What is Elimination?

400

Process to follow if you need a TL or GL to respond

What is Andon?

400

Duration used to calculate an individual station's overcycle

What is SOS Takt Time?

400

Quality double stamps this

What is the super critical buy off sticker?

400

The process that supports Production by maintaining the right quantities of parts

What is the min/max process?

500

A system used to proactively reduce hazards at Factory Zero

What is Workplace Safety Systems?

500

The first and last criteria to define a good goal metric

What is Specific and Time-bound?

500

The formula used to highlight the opportunity available in manufacturing build units, based on the actual running conditions of all main conveyors versus their true 12 month projected demand

Takt time - Actual Takt Time / Actual Takt Time

500

Process when a repeat defect is found at the VS gate 

What is Alarm and Escalation? 

500

Dual Presentation and High Volume Small Lot are example elementals this function

What is Lean Material Strategies?