Meaning of the acronym PI
What is People Involvement?
Meaning of the acronym CI
What is Continuous improvement?
Where the main elements of an operation are found
What is a Standard Task Sheet?
Meaning of the acronym BIQ
What is Built In Quality?
Meaning of the acronym SLT
What is Short Lead Time?
Driving EVolution on the AVenue of engagement
What is the plant vision/mission statement?
How we run the business
What is Business Plan Deployment?
Term used to identify total amount of time to completed standardize work
What is Actual Takt Time?
The process followed when an error proofing action has been off for an extended period of time
What is the Bypass Reaction Plan?
The policy in which a single piece of material flows
What is First In, First Out?
The process of how we train production operators
What is Job Instruction Training?
Process when you have a repeat defect multiple times
What is Practical Problem Solving?
One of the five principles of visual management, this one requires clear visuals in the policy of regular audits, tours, and monitoring requirements.
What is Sustain?
Fastener needing a secondary check?
What is a PS1, Critical Fastener, KPI?
Correction, Overproduction, Motion, Material Movement, Waiting, Inventory, Processing
What are the forms of waste?
The most preferred step in reducing a hazard
What is Elimination?
Process to follow if you need a TL or GL to respond
What is Andon?
Duration used to calculate an individual station's overcycle
What is SOS Takt Time?
Quality double stamps this
What is the super critical buy off sticker?
The process that supports Production by maintaining the right quantities of parts
What is the min/max process?
A system used to proactively reduce hazards at Factory Zero
What is Workplace Safety Systems?
The first and last criteria to define a good goal metric
What is Specific and Time-bound?
The formula used to highlight the opportunity available in manufacturing build units, based on the actual running conditions of all main conveyors versus their true 12 month projected demand
Takt time - Actual Takt Time / Actual Takt Time
Process when a repeat defect is found at the VS gate
What is Alarm and Escalation?
Dual Presentation and High Volume Small Lot are example elementals this function
What is Lean Material Strategies?