Complaints
Investigation
Office and Email Ettiquette
QMS Basics
Quality Control
100

This Department owns complaint intake and logging.

What is the Quality Department?

100

This action is taken to prevent occurrence of a potential problem before it happens

What is a preventative action?

100

Cleaning up shared spaces shows this.

What is respect?

100

This system is where you log deviations, complaints, create change controls, and CAPAs (and maybe cry a little).

What is the QMS (e.g., Veeva)?

100

This neurotoxin is the active pharmaceutical ingredient in Myobloc.

What is Botulinum Toxin Type B?

200

This type of complaint suggests a significant impact to patient safety

What is a critical complaint?

200

This diagram organizes causes into categories like people, process, and equipment.

What is a Fishbone diagram?

200

Joining meetings on time demonstrates this.

What is professionalism?

200

This acronym stands for rules we follow to keep products safe and compliant.

What is cGMP?

200

A measure of how well two peaks are separated.

What is resolution?

300

This identifier connects a complaint to a specific batch.

What is the lot number?

300

This process is used to identify the root cause or most probable root cause of a problem or issue.

What is an investigation?

300

Good meetings always include this.

What is an agenda?

300

This ensures changes are reviewed and approved before implementation

What is change control?

300

A peak tailing factor significantly greater than this value may indicate poor chromatography.

What is 2.0?

400

A cracked tablet or bubble in vial falls under this type of issue.

What is a product defect?

400

This confirms that corrective actions worked.

What is a (CAPA) effectiveness check?

400

Always do this before hitting send.

What is proofread?

400

Storage of where physical GMP Records are archived. 

What is the GxP Records Room?

400

This term describes the dose expected to cause death in 50% of a test population.

What is LD50?

500

This process is used to ensure that customer complaints provided by Contract PV Provider is aligned with data received by Supernus.

What is reconciliation?

500

Reviewing similar complaints to spot patterns is called this.

What is trending?

500

Acknowledging others’ work shows this.

What is teamwork?

500

World Quality Day this year (Hint: Date)

What is a 12 November 2026?

500

USP Apparatus 2 is commonly known as this.


What is the paddle apparatus?