Raw Mix to Clinker
10 Basic Facts of Clinker
Cement Hydration
Uniformity

Load & Haul
Crushing
Ravena Specific Questions
100

This clinker phase contributes most to strength development at all ages

What is C3S or Alites

100

Increasing this from 0.5% to 1.5% will improving setting time

What is free lime?

100

The hydration product that forms the "glue" when C3S contacts water

What is C-S-H, (or calcium silicate hydrates)?

100

The two types of Amrize Uniformity KPIs

What are short-term and long-term

100

A haul truck backs up to the Front End loader at a:

45 degree angle

100

What hazard could be present in the drilling dust when drilling abrasive rock?

Crystalline Silica

100

Prior to Ravena's modernization, Ravena was what kind of process with how many kilns?

Wet, 2 Kilns

200

In raw mix, this modulus (or calculated ratio) determines the potential for C3S and C2S formation in clinker

What is LSF

200

An increase in this will make the clinker harder to grind

What is C2S or belite?

200

Without the proper amount and phase of gypsum, C3A hydration is uncontrolled and results in this type of early stiffening?

What is flash set? (permanent loss of plasticity/workability)

200

Name two of the three parameters used to judge raw meal, kiln feed and clinker uniformity

What are LSF, AR and SR?

200

Which 3 plants have to barge their rock to the plant?

Joppa, Theodore, Richmond

200

To mine a uniform, single bench flat-lying deposit, the most appropriate crushing system is:

Mobile

200

This plant was first commissioned in what year & by what company?

1962, Atlantic Cement Co.

300

During this step of the burning process, the CO2 is driven off from the limestone

What is calcination or decarbonation

300

An increase in this will increase 1 day strengths, but decrease 28 day strengths

What are alkalis?

300

Apart from controlling C3A hydration, we optimize the gypsum addition at the mill to maximize this

What is strengths, or compressive strengths?

300

What type of stacker reclaimer system does Ravena use

Longitudinal cone stacker with a side reclaimer

300

Shift Efficiency is?

85%

300

What is the most cost-effective method to size reduction material?


Blasting

300

What is the primary source of silica for the Ravena raw mix?

Rock from the Ravena Quarry, Kalkberg

400

Name 1 of the 2 causes of undesirable Orthorhombic C3A in clinker

What is reducing conditions, or what is excess Alkalis (or high A/S ratio)

400

This type of heating profile inside the pyro system is ideal for product quality and grindability

What is "short", "short and sharp" or "fast"?

400

The gypsum phase needed to control C3A hydration, because it is the more soluble form

What is hemi-hydrate or plaster?
CaSO4-0.5H2O,

400

Which type of uniformity kpi relates to the impact on  the customer

Long-term

400

A front end loader sized appropriately for the haul truck fleets loads scoops in:

30 to 40 seconds

400

The most appropriate crusher to crush dry abrasive quartzite at 800 t/h is:

Gyratory Crusher

400

What rock formations need to be moved prior to getting to the high calcium rock?

Becraft & New Scotland, Kalkberg, Esopus & Topsoil
or Everything but Manlius and Coeymans

500

Too much of this indicates underburnt clinker and leads to strength loss and was previously thought to have the potential to cause expansion

What is free lime

500

Having excess of this causes finer clinker and higher grinding energy

What is sulfur, (what is low A/S ratio)?

500

Sulphates in this form come from clinker.

What is alkali sulphates OR SO3 clinker phases? 

500

Which type of uniformity kpi relates to the impact on the Control Room Operator

Short-term

500

What are 3 parts of the Highwall Safety Scorecard

Exposure to Hazard, Characteristics of Rock, Berm Distance

500

What is the most common crusher type within Amrize?

Single shaft Horizontal Impact Crusher

500

Name 2 of the 3 parameters that the quarry operator monitors and controls via the cross-belt analyzer

Alkalies (or K2O), MgO and SiO2