Tag Colors
Process Control
Repair of Mechanical Assemblies
Inspection and Testing
Final Inspection and Testing / Measuring
1

What color tag do conforming parts get?

Parts are tagged with a white inspection tag.

1

What happens when a foreman assigns a job to a craftsman?

The craftsman gets a copy of the job order complete with instructions/drawings?

1

Who fills out the job instruction card for mechanical assemblies?

Mechanical department foreman 

1

What department is responsible for inspection of incoming materials/parts?

Shipping and receiving

1

When a job is completed, the craftsman places it in the inspection area and turns in his copy of the job order and any drawings/instructions to who?

Inspector

1

What color tag is used for in process inspection?

In process inspection are blue tags.

1

What happens if a craftsman produces a non conforming part?

They notify their foreman and a documented determination is made.

1

What is the first step for reassembly of mechanical parts?

Parts are inspected before assembly and tagged.

1

What department is responsible for inspection of outgoing materials/parts?

Quality Assurance Director and Inspector

1

True or False

Parts can be shipped without an inspection tag.

False

No parts are shipped without an inspection tag.

1

What color tag is used for non conforming parts?

Non conforming get tagged red.

1

What happens to nonconforming parts?

They get tagged and put in a designated area.

1

True or False

In the balancing procedure for parts, upon completion, balancing results do not have to be documented for the pump shop foreman to review

False. 

Balancing results are documented and turned into the pump shop foreman for review.

1

True or False

Material purchased for a specific job has a job number written on it with a paint marker in plain view.

True

1

All micrometer calibrations are within ______" of standards.

.0002"