What color tag do conforming parts get?
Parts are tagged with a white inspection tag.
What happens when a foreman assigns a job to a craftsman?
The craftsman gets a copy of the job order complete with instructions/drawings?
Who fills out the job instruction card for mechanical assemblies?
Mechanical department foreman
What department is responsible for inspection of incoming materials/parts?
Shipping and receiving
When a job is completed, the craftsman places it in the inspection area and turns in his copy of the job order and any drawings/instructions to who?
Inspector
What color tag is used for in process inspection?
In process inspection are blue tags.
What happens if a craftsman produces a non conforming part?
They notify their foreman and a documented determination is made.
What is the first step for reassembly of mechanical parts?
Parts are inspected before assembly and tagged.
What department is responsible for inspection of outgoing materials/parts?
Quality Assurance Director and Inspector
True or False
Parts can be shipped without an inspection tag.
False
No parts are shipped without an inspection tag.
What color tag is used for non conforming parts?
Non conforming get tagged red.
What happens to nonconforming parts?
They get tagged and put in a designated area.
True or False
In the balancing procedure for parts, upon completion, balancing results do not have to be documented for the pump shop foreman to review
False.
Balancing results are documented and turned into the pump shop foreman for review.
True or False
Material purchased for a specific job has a job number written on it with a paint marker in plain view.
True
All micrometer calibrations are within ______" of standards.
.0002"